1. Home
  2. GK Questions
  3. Himachal Pradesh GK
  4. Himachal Pradesh: Hydropower and Energy

Himachal Pradesh: Hydropower and Energy — GK Questions with Answers

26 questions
  1. When was Chamba’s first hydro station started? (HP Naib Tehsildar 2008)
    1. 1890
    2. 1910
    3. 1895
    4. 1915
    Show answer

    Answer: (B) 1910

    1910 — Bhuri Singh power house.

  2. Which old district was the pioneer in hydro power? (HP TGT 2014)
    1. Kangra
    2. Hamirpur
    3. Shimla
    4. Chamba
    Show answer

    Answer: (D) Chamba

    Chamba.

  3. Which river has the highest hydro potential? (HP TET 2013)
    1. Yamuna
    2. Sutlej
    3. Beas
    4. Ravi
    Show answer

    Answer: (B) Sutlej

    Sutlej > Beas > Chenab > Ravi.

  4. The oldest hydro project in Himachal (of the options)? (HP Tehsil Welfare Officer 2007)
    1. Shanan
    2. Holi
    3. Chaba
    4. Nogli
    Show answer

    Answer: (A) Shanan

    Shanan, 1932 (Bhuri Singh 1910 is not an option).

  5. Original name of "Sanjay Vidyut Pariyojana"? (HP Allied Services 2009)
    1. Sal-II
    2. Bhaba
    3. Malana-I
    4. Neugal
    Show answer

    Answer: (B) Bhaba

    Bhaba — Kinnaur.

  6. Which project is fully underground? (HPSI 2008)
    1. Sanjay Vidyut Pariyojana
    2. Neugal
    3. Malana-II
    4. Upper Joiner
    Show answer

    Answer: (A) Sanjay Vidyut Pariyojana

    Sanjay (Bhaba).

  7. Larji project is on which river? (HP TGT 2005)
    1. Beas
    2. Ravi
    3. Chenab
    4. Yamuna
    Show answer

    Answer: (A) Beas

    Beas, Kullu.

  8. Binwa project is in which district? (HP TET 2016)
    1. Kangra
    2. Kullu
    3. Kinnaur
    4. Shimla
    Show answer

    Answer: (A) Kangra

    Kangra — near Baijnath.

  9. Where is the 2 MW Rongtong project? (HP Naib Tehsildar 2014)
    1. Kangra
    2. Lahaul-Spiti
    3. Mandi
    4. Kullu
    Show answer

    Answer: (B) Lahaul-Spiti

    Lahaul-Spiti.

  10. When did work on the Bhakra dam begin?
    1. 1951
    2. 1948
    3. 1949
    4. 1950
    Show answer

    Answer: (B) 1948

    1948; completed 1963.

  1. In which year was the Bhakra dam completed? (HPPSC 2006)
    1. 1970
    2. 1967
    3. 1965
    4. 1963
    Show answer

    Answer: (D) 1963

    1963.

  2. Pong dam’s other name? (HP ETI 2008)
    1. Maharana Pratap Sagar
    2. Gobind Sagar
    3. Sansar Chand dam
    4. Jahangir canal
    Show answer

    Answer: (A) Maharana Pratap Sagar

    Maharana Pratap Sagar.

  3. Total capacity of the Beas-Sutlej Link? (HP Tehsil Welfare Officer 2009)
    1. 990 MW
    2. 320 MW
    3. 1100 MW
    4. 850 MW
    Show answer

    Answer: (A) 990 MW

    Dehar power house 990 MW.

  4. Baira Siul is on tributaries of which river?
    1. Sutlej
    2. Chenab
    3. Ravi
    4. Beas
    Show answer

    Answer: (C) Ravi

    Ravi — Baira, Siul, Bhaledh.

  5. Which project belongs to NTPC?
    1. Baira Siul
    2. Chamera
    3. Kol Dam
    4. Parbati
    Show answer

    Answer: (C) Kol Dam

    Kol Dam, 800 MW.

  6. What is Kol Dam’s capacity? (HP TET 2015)
    1. 200 MW
    2. 165 MW
    3. 500 MW
    4. 800 MW
    Show answer

    Answer: (D) 800 MW

    800 MW.

  7. Nathpa-Jhakri’s capacity? (HPPSC 2015)
    1. 2150 MW
    2. 1500 MW
    3. 2010 MW
    4. 165 MW
    Show answer

    Answer: (B) 1500 MW

    1500 MW, SJVN.

  8. Which project is linked with the Ravi?
    1. Baira Siul
    2. Chamera-I
    3. Chamera-II
    4. All of these
    Show answer

    Answer: (D) All of these

    All three are on the Ravi in Chamba.

  9. Where is the Allain-Duhangan project?
    1. Kangra
    2. Kullu
    3. Kinnaur
    4. Hamirpur
    Show answer

    Answer: (B) Kullu

    Kullu (near Manali).

  10. Karcham-Wangtoo is in which district?
    1. Kangra
    2. Chamba
    3. Kullu
    4. Kinnaur
    Show answer

    Answer: (D) Kinnaur

    Kinnaur.

  1. When was HPSEB formed? (HP Tehsil Welfare Officer 2009)
    1. 1971
    2. 1981
    3. 1979
    4. 1980
    Show answer

    Answer: (A) 1971

    1 September 1971.

  2. Where is the Disaster Recovery Centre? (HPNT 2014)
    1. Baddi
    2. Paonta Sahib
    3. Kufri
    4. Jogindernagar
    Show answer

    Answer: (B) Paonta Sahib

    Paonta Sahib.

  3. Which district had the lowest share of electrified villages in 2011? (HAS Pre style)
    1. Kullu
    2. Kinnaur
    3. Kangra
    4. Lahaul-Spiti
    Show answer

    Answer: (B) Kinnaur

    Kinnaur.

  4. HIMURJA works in which field?
    1. Renewable energy
    2. Power distribution
    3. Afforestation
    4. Smart cities
    Show answer

    Answer: (A) Renewable energy

    Renewable energy — MNRE + state.

  5. In which district was a site picked for a solar plant? (HP Allied Services 2016)
    1. Hamirpur
    2. Solan
    3. Bilaspur
    4. Mandi
    Show answer

    Answer: (C) Bilaspur

    Bassi, Bilaspur — 5 MW.

  6. Statements — I. Bhakra is India’s highest gravity dam. II. Gobind Sagar is India’s second largest reservoir by storage. Correct?
    1. Only I
    2. Only II
    3. Both I and II
    4. Neither
    Show answer

    Answer: (C) Both I and II

    Both correct.

More chapters in this subject

Free Study Planner