1. Home
  2. Current Affairs
  3. Economy & Banking
  4. Bihar

Bihar Economy & Banking Current Affairs 2026

The economy & banking news of Bihar for SSC, Railway, Banking, UPSC and state exams. Bihar's Road Construction Department is advancing a 35.65 km Digha-Sherpur-Bihta corridor to extend the JP Ganga Path, which is expected to cut Patna-Koilwar travel time to about 30 minutes, reported on 2 November.

Updated: 66 news items

Mind map

Tap a branch to open it. Every news item of this page is inside the map and in the text below.

Bihar Economy & Banking Current Affairs 2026 — Full notes

Published: · Updated:

Bihar Economy & Banking Current Affairs 2026 — Bihar · 66 news items

At a glance

the top events

The most important events of this page, and how many news items each topic holds.

Top events
  1. 28 Oct — The Vishnupad Corridor at Gaya, estimated at Rs 2,500 crore, is reported to be headed for a foundation stone in February 2027 during PM Modi's proposed Bodh Gaya visit; the construction agency is to be picked by December 2026.
  2. 24 Oct — Bihar CM Samrat Choudhary launched the Bihar Integrated Manufacturing City Gaya Ltd (BIMCGL) at Bodh Gaya on 24 October with its land allotment portal; it is developing a 1,670-acre cluster at Dobhi under the Amritsar-Kolkata Industrial Corridor.
  3. 15 Oct — Chief Minister Samrat Choudhary inaugurated the Rs 140.95 crore Mega Leather, Footwear and Accessories Cluster at Mahwal, Muzaffarpur. An MoU was signed with the Footwear Design and Development Institute (FDDI).
  4. 12 Oct — The Bihar Cabinet approved buying about 50 acres near Darbhanga International Airport for a logistics park and cargo hub, at a compensation of roughly Rs 225.91 crore. In all, 23 agenda items were cleared.
  5. 9 Oct — Chief Minister Samrat Choudhary launched the Bihar MSME Policy 2026, aiming to link one crore families with enterprise. The Chief Minister Entrepreneur Scheme costs Rs 3,500 crore and targets 45,000 entrepreneurs.
  6. The under-construction Pirpainti ultra-supercritical thermal project in Bhagalpur district has been enlarged from 2,400 MW to 4,800 MW; Adani Power is developing it and it should create about 10,000-12,000 construction jobs.
  7. 30 Sept — Bihar's Green Hydrogen Policy, 2026 targets 1 lakh tonnes of green hydrogen a year by 2031, with about Rs 16,000 crore investment and 12,000 jobs. The draft was cleared by the Cabinet; BREDA is the nodal agency.
  8. 30 Sept — Bihar proposed Rs 10,000 crore in the first phase for two greenfield airports on the PPP model: Ajgaibinath Dham in Bhagalpur and an international airport at Sonepur in Saran.
  9. 24 Aug — The Bihar Cabinet cleared a six-lane greenfield road of 336 km linking Buxar and Bhagalpur, to be built by the state road development corporation (BSRDCL).
  10. 10 Aug — With APEDA's help, 18 tonnes of GI-tagged Mithila Makhana from Darbhanga farmers left BIADA Bihta for Australia, the first commercial export of this makhana by sea.
News by topic
Economy
66 one-liners

Economy

66 one-liners

RBI · markets · trade · reports.

November 2026

5 one-liners

Economy · November 2026

Economy & Banking
  • Which civic body listed Bihar's first municipal bond on the NSE in November 2026? — Patna Municipal Corporation
    10 Nov — Patna Municipal Corporation listed Bihar's first municipal bond on the NSE on 10 November 2026, raising about Rs 199.99 crore at a 9.20% coupon to fund 15 projects such as market redevelopment and better civic services.
  • Over which river is the Railway Board-approved four-line rail bridge at Koilwar in Bihar to be built? — Son (Sone) river
    3 Nov — The Railway Board has approved a four-line rail bridge over the Son river at Koilwar, near Ara, as part of a Rs 3,500 crore plan to add lines on the roughly 400 km DDU Junction-Jhajha route.
  • Which greenfield expressway, costing Rs 31,987 crore, is the largest of four Bihar road projects awaiting CCEA approval? — Patna-Purnia Greenfield Expressway
    3 Nov — Four Bihar road projects worth about Rs 49,751 crore, including the Patna-Purnia Greenfield Expressway at Rs 31,987 crore, have cleared the PPPAC and await final approval from the CCEA.
  • Which Patna riverside road will the 35.65 km Digha-Sherpur-Bihta corridor extend? — JP Ganga Path
    2 Nov — Bihar's Road Construction Department is advancing a 35.65 km Digha-Sherpur-Bihta corridor to extend the JP Ganga Path, which is expected to cut Patna-Koilwar travel time to about 30 minutes, reported on 2 November.
  • What MSP per quintal did Bihar fix for common paddy for the procurement that began on 1 November 2026? — Rs 2,441
    1 Nov — Bihar started paddy procurement at the minimum support price in 19 north Bihar districts from 1 November (south Bihar follows on 15 November), fixing the MSP at Rs 2,441 a quintal for common paddy across 2,385 purchase centres.

October 2026

32 one-liners

Economy · October 2026

Economy & Banking

32 one-liners

32 Economy & Banking — 9 Oct – 28 Oct.

Economy & Banking — 32 one-liners

Part 1

24 Oct – 28 Oct

Economy & Banking: 16.

  • How much viability-gap funding did Bihar approve to the Airports Authority of India under the UDAN scheme? — Rs 43.50 crore
    28 Oct — Bihar's cabinet approved Rs 43.50 crore in viability-gap funding to the Airports Authority of India for regional air connectivity under the UDAN scheme, from May 2026 to September 2028.
  • How many acres of the former Motipur Sugar Mill land did Bihar transfer to the Industries Department? — 151.58 acres
    28 Oct — Bihar transferred 151.58 acres of the former Motipur Sugar Mill land in Muzaffarpur district to the Industries Department, clearing the way for new industrial use of the site.
  • What kind of new townships did Bihar's cabinet allow near its growing cities by lifting land transfer restrictions? — Greenfield satellite townships
    28 Oct — Bihar's cabinet lifted land purchase, sale and transfer restrictions in selected areas to allow new greenfield satellite townships near its growing cities, among 43 proposals cleared at the same meeting.
  • Which 73.51-km greenfield corridor approved by Bihar runs through Gopalganj district? — Narayani Path
    28 Oct — Bihar's other two new greenfield corridors are the 56-km Ganga Ambika Path between Bidupur and Dighwara, and the 73.51-km Narayani Path through Gopalganj district, both approved as four-lane PPP highways.
  • Which new greenfield four-lane highway in Bihar will run about 90 km from Buxar to Ara to Maner? — Vishwamitra Path
    28 Oct — Among Bihar's new road corridors, the Vishwamitra Path will run about 90 km from Buxar to Ara to Maner as a four-lane greenfield highway along the Ganga, under the state's latest PPP road programme.
  • Which corporation will build Bihar's three new greenfield four-lane road corridors under the PPP model? — Bihar State Road Development Corporation
    28 Oct — Bihar's cabinet sanctioned Rs 37.10 crore for transaction-adviser consultancy on three greenfield four-lane road corridors totalling about 220 km, to be built under the PPP model by the Bihar State Road Development Corporation.
  • What credit-deposit ratio does the Bihar MSME Policy 2026 target? — 75%
    28 Oct — Bihar's cabinet gave ex-post facto approval to the Bihar MSME Policy 2026, targeting one crore entrepreneurial families, one crore jobs and a 75% credit-deposit ratio, with an industrial cluster and MSME centre planned in every one of the state's 38 districts.
  • Which policy did Bihar's cabinet approve in October 2026 to attract AI companies and Global Capability Centres? — Bihar AI Policy 2026
    28 Oct — Bihar's cabinet approved the Bihar AI Policy 2026 to push AI-driven governance, investment and skilled jobs, offering capital, cloud and power-tariff subsidies to AI companies and Global Capability Centres in sectors like agriculture, healthcare and education.
  • In which district of Bihar is Warisaliganj, where a new sugar mill with a distillery was cleared under Saat Nischay-3? — Nawada
    28 Oct — Bihar's cabinet cleared a new sugar mill with a distillery, co-generation power plant and compressed biogas unit at Warisaliganj in Nawada district, under the Saat Nischay-3 programme to revive closed sugar mills.
  • How much did Bihar sanction for a feasibility study of an underground road corridor in Patna? — Rs 18.21 crore
    28 Oct — The Bihar cabinet sanctioned Rs 18.21 crore for a feasibility study on an underground road corridor in Patna, covering routes such as R Block Crossing to Kankarbagh and Dak Bungalow Crossing to Patna Women's College.
  • How much did Bihar's cabinet approve in October 2026 to upgrade low-tension electricity distribution? — Rs 11,096.55 crore
    28 Oct — Bihar's cabinet approved an Rs 11,096.55-crore upgrade of low-tension electricity distribution, to be carried out in phases over up to three years by the North Bihar and South Bihar power distribution companies.
  • On what length of stretch does Patna Metro run, as of October 2026? — 6.2 km
    28 Oct — Patna Metro runs on a 6.2 km stretch with four stations; the Khemnichak interchange is due next month, the Patna Junction interchange by 2028, and the 3.1 km Khemnichak-Mithapur section is set to open in June 2027.
  • What is the estimated cost of the Vishnupad Corridor planned at Gaya in Bihar? — Rs 2,500 crore
    28 Oct — The Vishnupad Corridor at Gaya, estimated at Rs 2,500 crore, is reported to be headed for a foundation stone in February 2027 during PM Modi's proposed Bodh Gaya visit; the construction agency is to be picked by December 2026.
  • Which central scheme for micro food processing enterprises helped a young entrepreneur in Sheikhpura, Bihar, build a mushroom business? — PMFME
    26 Oct — A young entrepreneur in Sheikhpura district, Bihar, has reportedly built a mushroom business and employed local workers with help from the central PMFME scheme for micro food processing enterprises.
  • How many new industrial areas across 25 districts is Bihar reported to be preparing in October 2026? — 28
    25 Oct — Bihar is reported to be preparing 28 new industrial areas across 25 districts, and land acquisition has begun for about 14,600 acres, as the state reports 1,091 investment proposals since 2025.
  • What is the bank lending target of Bihar's Annual Credit Plan 2026-27? — Rs 4.95 lakh crore
    24 Oct — Bihar's Annual Credit Plan 2026-27 targets Rs 4.95 lakh crore of bank lending; by 30 September banks had given Rs 1.89 lakh crore (38.25%), and the state's Credit-Deposit Ratio stood at 60.17%.

Part 2

9 Oct – 24 Oct

Economy & Banking: 16.

  • Which special purpose vehicle, launched at Bodh Gaya in October 2026, will develop an integrated manufacturing city under the national industrial corridor programme? — Bihar Integrated Manufacturing City Gaya Limited
    24 Oct — Bihar Integrated Manufacturing City Gaya Limited is a special purpose vehicle of the Bihar Industrial Area Development Authority and the National Industrial Corridor Trust with equal equity, under the national industrial corridor programme; 12 MoUs cover about 300 acres.
  • When is Bihar Business Connect 2027 planned? — 17-18 February 2027
    24 Oct — The Bodh Gaya event was the curtain-raiser for Bihar Business Connect 2027, planned for 17-18 February 2027; Bihar also plans air links from Gaya to Dubai and Kathmandu, and the Gaya city lies on the Amritsar-Kolkata Industrial Corridor.
  • Near which place is the Bihar Integrated Manufacturing City Gaya being developed? — Dobhi, near Bodh Gaya
    24 Oct — Bihar CM Samrat Choudhary launched the Bihar Integrated Manufacturing City Gaya Ltd (BIMCGL) at Bodh Gaya on 24 October with its land allotment portal; it is developing a 1,670-acre cluster at Dobhi under the Amritsar-Kolkata Industrial Corridor.
  • Which bank reportedly topped the first ranking of Bihar's 100-point bank performance index? — IDFC First Bank
    24 Oct — Bihar introduced a 100-point performance assessment index to rank the banks working in the state; IDFC First Bank reportedly topped the first ranking with 74 points.
  • Where did CM Samrat Choudhary inaugurate a ₹140.95 crore Mega Leather, Footwear and Accessories Cluster in October 2026? — Mahwal, Muzaffarpur
    15 Oct — Chief Minister Samrat Choudhary inaugurated the Rs 140.95 crore Mega Leather, Footwear and Accessories Cluster at Mahwal, Muzaffarpur. An MoU was signed with the Footwear Design and Development Institute (FDDI).
  • Where did the Bihar Cabinet approve a new grid substation costing ₹575.36 crore in October 2026? — Pipra, Supaul
    12 Oct — The Bihar Cabinet approved a new grid substation at Pipra, Supaul, costing Rs 575.36 crore, and a Rs 75 crore grant to the Khagaria District Central Cooperative Bank to reach 9% CRAR.
  • Near which Bihar airport did the Cabinet approve land for a logistics park and cargo hub in October 2026? — Darbhanga International Airport
    12 Oct — The Bihar Cabinet approved buying about 50 acres near Darbhanga International Airport for a logistics park and cargo hub, at a compensation of roughly Rs 225.91 crore. In all, 23 agenda items were cleared.
  • By which year did CM Samrat Choudhary ask officials to complete the Patna Metro project? — 2028
    11 Oct — Chief Minister Samrat Choudhary inspected work along Nehru Path, Patna, and told officials to finish the Patna Metro project by 2028. He also ordered two foot overbridges on Nehru Path.
  • How many entrepreneurs does Bihar's Chief Minister Entrepreneur Scheme target under the MSME Policy 2026? — 45,000
    9 Oct — Chief Minister Samrat Choudhary launched the Bihar MSME Policy 2026, aiming to link one crore families with enterprise. The Chief Minister Entrepreneur Scheme costs Rs 3,500 crore and targets 45,000 entrepreneurs.
  • Which round of the National Sample Survey began fieldwork in Bihar in October 2026? — 81st
    Bihar's Directorate of Economics and Statistics began fieldwork for the 81st round of the NSS, covering household income, debt and investment. It runs until June 2027.
  • What rooftop solar target on government buildings has Bihar set for 2029-30? — 500 MW
    Bihar set a target of 500 MW rooftop solar on government buildings by 2029-30 under Phase 3 of the Jal-Jeevan-Hariyali campaign. BREDA will use the RESCO (Renewable Energy Service Company) model.
  • Which five Bihar districts are proposed station districts on the Varanasi-Patna-Siliguri high-speed rail corridor? — Patna, Buxar, Begusarai, Khagaria and Katihar
    The proposed Varanasi-Patna-Siliguri high-speed rail corridor has five Bihar station districts: Patna, Buxar, Begusarai, Khagaria and Katihar. It is one of seven corridors announced in the Union Budget 2026-27.
  • Where is a 2,800 MW nuclear power project proposed in Bihar's energy investment plan? — Banka
    Bihar plans Rs 1,88,383 crore of energy investment, with peak demand projected at 11,747 MW by 2030. Plans include 8,400 MW of pumped storage, a 2,800 MW nuclear project in Banka and five Green Hydrogen Villages.
  • What renewable energy capacity does Bihar aim to reach by 2029-30? — 24 GW
    Bihar's energy plans rest on the Bihar Policy for Promotion of New and Renewable Energy Sources, 2025 and aim for 24 GW of renewable capacity and 6.1 GWh of energy storage by 2029-30.
  • By which year is the third railway line between Jamalpur and Bhagalpur targeted for completion? — 2029-30
    Indian Railways has set 2029-30 as the target to finish the third railway line between Jamalpur and Bhagalpur, and a survey is under way for third and fourth lines between Barharwa and Kiul.
  • What is the enlarged capacity of the Pirpainti thermal power project in Bhagalpur, Bihar? — 4,800 MW
    The under-construction Pirpainti ultra-supercritical thermal project in Bhagalpur district has been enlarged from 2,400 MW to 4,800 MW; Adani Power is developing it and it should create about 10,000-12,000 construction jobs.

September 2026

10 one-liners

Economy · September 2026

Economy & Banking
  • Which agency is the nodal agency for the Bihar Green Hydrogen Policy, 2026? — BREDA (Bihar Renewable Energy Development Agency)
    30 Sept — Bihar's Green Hydrogen Policy, 2026 targets 1 lakh tonnes of green hydrogen a year by 2031, with about Rs 16,000 crore investment and 12,000 jobs. The draft was cleared by the Cabinet; BREDA is the nodal agency.
  • Which two greenfield airports did Bihar propose in September 2026 with a combined first-phase cost of Rs 10,000 crore? — Ajgaibinath Dham (Bhagalpur) and Sonepur (Saran)
    30 Sept — Bihar proposed Rs 10,000 crore in the first phase for two greenfield airports on the PPP model: Ajgaibinath Dham in Bhagalpur and an international airport at Sonepur in Saran.
  • Where will Bihar set up the new sugar mill approved by the Cabinet in September 2026? — Warisaliganj, Nawada district
    23 Sept — The Bihar Cabinet also approved a sugar mill to be built at Warisaliganj (Nawada district), 50 police drones for Rs 24.50 crore and the e-SushrutNX hospital software in 12 medical institutions.
  • Which Bihar scheme approved in September 2026 gives livestock farmers a 100% interest subsidy on bank loans? — Mukhyamantri Go-Dhan Vikas Rin Yojana
    23 Sept — The same Cabinet meeting cleared a scheme called Mukhyamantri Go-Dhan Vikas Rin Yojana, which pays the full interest on eligible bank loans taken by livestock farmers in Bihar.
  • In which Bihar district will the Rs 100 crore Frozen Semen Station be built under the National Gokul Mission? — Lakhisarai
    10 Sept — A Frozen Semen Station costing about Rs 100 crore will come up at Gopalpur village (Chanan block) in Lakhisarai, able to make 50 lakh semen doses a year to improve Bihar's cattle breeds.
  • How many Farmer Drone Custom Hiring Centres will Bihar set up in 2026-27? — 480
    7 Sept — Under its Fourth Agricultural Road Map, Bihar will set up 480 custom hiring centres for farm drones in 2026-27, where farmers can rent drones to spray pesticides and nutrients.
  • What was Bihar's fish production in 2025-26? — 10.28 lakh metric tonnes
    4 Sept — Bihar's fish output rose to 10.28 lakh tonnes in 2025-26 from 9.69 lakh tonnes a year earlier, and its 233 hatcheries now meet about 70% of the state's fish seed demand.
  • What is the maximum one-time premium help a SC, ST or woman fish farmer in Bihar can get under PM-MKSSY aquaculture insurance? — Rs 1.10 lakh
    4 Sept — Bihar is urging fish farmers to insure their ponds under the central PM-MKSSY, which pays 40% of the premium once, up to Rs 1 lakh, with 10% more for SC, ST and women farmers.
  • How many stations of the Samastipur Division will get Electronic Interlocking under the Rs 233 crore sanction of September 2026? — 21 stations
    2 Sept — The Railway Ministry sanctioned Rs 233 crore to fit Electronic Interlocking at 21 stations of East Central Railway's Samastipur Division, which serves north Bihar.
  • To which date was the deadline of the Digha-Sonpur six-lane Ganga bridge in Bihar extended? — December 2028
    The Digha-Sonpur six-lane bridge over the Ganga, built beside JP Setu, has only 17.24% work done after nearly three years, so its deadline moved from November 2027 to December 2028.

August 2026

19 one-liners

Economy · August 2026

Economy & Banking

19 one-liners

19 Economy & Banking — 3 Aug – 29 Aug.

  • On which state's model will Bihar modernise 31 BSRTC bus stands? — Gujarat
    29 Aug — Bihar approved rebuilding 31 BSRTC bus stands in PPP mode, copying Gujarat's GSRTC Bus Port model, with shops and EV charging.
  • How many block-level animal medicine sales centres does Bihar plan? — 534
    28 Aug — Bihar plans 534 animal medicine centres, one per block, of which the Centre has cleared 109 first, and has formed a Mithila Handicrafts Cooperative Society for women artisans.
  • How long will the proposed Ganga Marine Drive based on J.P. Ganga Path be? — 126 km
    26 Aug — CM Samrat Choudhary announced a 126-km Ganga Marine Drive built by extending the J.P. Ganga Path of Patna, at an estimated ₹70,000 crore.
  • What is the length of the Buxar-Bhagalpur six-lane greenfield road cleared by the Bihar Cabinet in August 2026? — 336 km
    24 Aug — The Bihar Cabinet cleared a six-lane greenfield road of 336 km linking Buxar and Bhagalpur, to be built by the state road development corporation (BSRDCL).
  • Which section of NH-22 in Bihar did the CCEA approve for four-laning in August 2026? — Muzaffarpur-Sitamarhi-Sonbarsa
    24 Aug — The CCEA cleared a ₹3,590 crore plan to make the 82.578-km Muzaffarpur-Sitamarhi-Sonbarsa stretch of NH-22 four-lane under the Hybrid Annuity Mode.
  • Where was the National Makhana Board launched on 15 September 2025? — Bihar
    21 Aug — India's makhana output is estimated at 80,590 tonnes in 2025-26, up from 63,910 tonnes; the National Makhana Board (launched in Bihar on 15 September 2025) works with a Rs 476.03 crore central scheme for 2025-26 to 2030-31.
  • Which pulse is being procured in Bihar's first structured procurement under the Atmanirbhar Pulses Mission? — Masoor (lentil)
    20 Aug — NCCF began Bihar's first organised pulse procurement under the Atmanirbhar Pulses Mission, buying masoor (lentil) with a state target of 32,000 tonnes.
  • How many mineral blocks are in the 8th tranche of critical mineral auctions promoted at the Patna roadshow? — 20
    18 Aug — The Union Mines Ministry held a Patna roadshow for the 8th tranche of critical and strategic mineral block auctions and a workshop on the NMEDT, chaired by MoS Satish Chandra Dubey.
  • Which Bihar district leads in the number of farmers with Sugarcane IDs, ahead of Darbhanga? — West Champaran
    17 Aug — Darbhanga is second among Bihar districts in farmers holding a Sugarcane ID, with 24,215 sign-ups, behind West Champaran.
  • Which two places are linked by the 28.918-km Bhagalpur-Madhepura mega bridge? — Bihpur and Phulaut
    14 Aug — The ₹1,478.40 crore bridge-cum-road from Bihpur (Bhagalpur) to Phulaut (Madhepura), 28.918 km long, is 98.7% complete and should open by February 2027.
  • Which credit rating did Patna Municipal Corporation receive in August 2026 ahead of its municipal bond? — AA
    13 Aug — India Ratings & Research rated Patna Municipal Corporation 'AA', clearing the way for its planned ₹200 crore municipal bond, to be listed on the NSE.
  • How much investment did Bihar secure in footwear and leather at IIFF 2026? — ₹125 crore
    11 Aug — At IIFF 2026, the tenth India International Footwear Fair at Bharat Mandapam, Bihar signed two deals worth ₹125 crore in footwear and leather, expected to create about 1,800 jobs.
  • What is the daily capacity of the ₹77 crore milk powder plant in Sitamarhi? — 30 metric tonnes
    10 Aug — A fully automated ₹77 crore milk powder plant of 30 tonnes a day has come up in Sitamarhi under TIMUL, a unit of the state dairy federation COMFED, to absorb North Bihar's surplus milk.
  • Which country received the first commercial consignment of Mithila Makhana sent by sea in August 2026? — Australia
    10 Aug — With APEDA's help, 18 tonnes of GI-tagged Mithila Makhana from Darbhanga farmers left BIADA Bihta for Australia, the first commercial export of this makhana by sea.
  • How large a five-year power-sector investment plan did Bihar present at IECE 2026? — ₹1.40 lakh crore
    7 Aug — At IECE 2026, the seventh energy conference and exhibition of the CII in New Delhi, Bihar presented a ₹1.40 lakh crore five-year power-sector investment roadmap to become power-surplus and greener.
  • Between which two ghats of Patna did a 200-seater Ganga steamer service start in August 2026? — Fakkad Mahto Ghat and Nasriganj Ghat
    5 Aug — A 200-seat steamer now crosses the Ganga in Patna linking Fakkad Mahto Ghat with Nasriganj Ghat, with free rides for people of seven Diara-area panchayats.
  • In which district has the first fish brood bank of Bihar come up? — Sitamarhi
    5 Aug — The first Fish Brood Bank of Bihar stands at Raghopur Bakhri (Dumra, Sitamarhi) for ₹10.92 crore under the PM Matsya Sampada Yojana, to supply improved breeder fish and disease-free seed.
  • To which country was the first 7-tonne consignment of Bihar makhana exported in August 2026? — Canada
    3 Aug — A first lot of 7 tonnes of Bihar's makhana (fox nut) was shipped to Canada, opening a new overseas market for the crop of which Bihar grows about 90% of India's output.
  • What is the length of the Danapur-Fatuha multitracking project sanctioned by Indian Railways in August 2026? — 29 km
    3 Aug — Indian Railways sanctioned a ₹976 crore project to add tracks on the 29-km Danapur-Fatuha stretch of the East Central Railway around Patna, part of quadrupling the Delhi-Patna-Howrah route.

Frequently asked questions

Where can I read Bihar economy & banking current affairs 2026?

Right here: 100 one-liners as a mind map, open a branch to read every item. Use the Location row above to switch between India and any state.

How often is this page updated?

New items are added every day, so bookmark the page.

More to revise

TodayStatic GKGK questions with answersFree mock tests

Free Study Planner