Work and Wages Questions

170 Questions with Answers and Solutions · SSC, Banking, Railway

14 Part170 practice questions

This page has 170 questions in 14 types. It leaves out the plain one- and two-worker "how many days" drills (those are in the Time and Work questions) and goes to the harder side: how wages are shared, the chain rule, men-women-boys equivalence, workers leaving or joining midway, shift work, someone undoing the work and contracts with bonus and fine.

How to use it: try each question on paper first, then choose an option. The answer and the step-by-step solution open only after you choose. The small hint under some questions is the exam shortcut. Inside each part the questions go from easier to harder, and every part starts with one short rule to remember.

RememberThree ideas work in almost every question: (1) wages are shared in the ratio of the work done; (2) work = workers × days × hours × efficiency; (3) unless told otherwise, take the whole job as 1 (or as an LCM number of units).
1

A. Wages shared in the ratio of work

Questions 1–12

Finding each share from daily efficiency, "x% more", "twice as", and days alone.

∑ Formula
Wages follow the work done
daily work (efficiency); if alone in days,
days actually worked
BasicTry it yourself first
Ramesh alone can finish a job in 18 days and Suresh alone in 12 days. They take the job for ₹9,000, work on it together and finish it. How much does Ramesh get?
BasicTry it yourself first
Three painters can paint a wall alone in 6, 8 and 12 days. They paint it together and receive ₹13,500, shared in the ratio of work done. How much more does the fastest painter get than the slowest?
StandardTry it yourself first
On a road repair, A is twice as efficient as B and B is one and a half times as efficient as C. The three work together till the job ends and share ₹16,500 in the ratio of work done. How much does C get?
StandardTry it yourself first
A and B together finish a job in 12 days; A alone would take 20 days. The wage for the job is ₹12,000. How much does B get?
StandardTry it yourself first
Two painters paint a building together and earn ₹14,400, which is split as ₹9,000 and ₹5,400. The faster painter alone would take 15 days. How long would the slower painter take alone?
StandardTry it yourself first
A, B and C together clean a canal in 4 days. A alone could do it in 12 days and B alone in 18 days. The total wage is ₹18,000. What is C's share?
StandardTry it yourself first
Three craftsmen can do a job alone in 8, 12 and 24 days. They finish it working together. The second craftsman (the 12-day one) received ₹3,600. What was the total payment to the three?
AdvancedTry it yourself first
In a contract, A is 25% more efficient than B and B is 20% more efficient than C. All three work for the same number of days and share ₹22,200 in the ratio of work. How much does A get?
AdvancedTry it yourself first
A is 50% more efficient than B. Together they lay the floor of a warehouse in 15 days. The contract was ₹8,100, of which ₹300 went on carrying materials. The rest was shared in the ratio of work. How much did B get?
◭ Diagram
Daily output (units)A6B4C2
Daily output of three workers
AdvancedTry it yourself first
The figure shows the daily output (in units) of three labourers. Together they complete a job of 168 units and receive ₹8,400, shared in the ratio of work. How much more does A get than C?
AdvancedTry it yourself first
In a textile mill A works 8 hours a day and weaves 3 metres an hour; B works 6 hours a day and weaves 5 metres an hour. They work the same number of days and are paid ₹13,500, shared in the ratio of metres woven. How much does B get?
BasicTry it yourself first
A municipality gives a contract to lay a 600-metre pipeline at ₹120 per metre. A lays 12 m a day and B lays 8 m a day. They lay the whole line together and each is paid for the metres he laid. How much does B earn?
2

B. Workers joining or leaving midway

Questions 13–23

Wages follow the days actually worked: joining, leaving, replacing and staying absent.

RememberEach person's work = his daily rate × the days he was present. All the work adds up to the whole job (1 or the LCM), which is also your check.
BasicTry it yourself first
A alone can do a job in 20 days and B alone in 30 days. They start together, A leaves after 6 days and B finishes the rest alone. The whole job pays ₹10,000. How much does B get?
StandardTry it yourself first
A, B and C can do the railing work of a bridge alone in 12, 24 and 8 days. A and B start; after 4 days C joins, and the three finish the job. The total wage ₹24,000 is shared in the ratio of work. How much does C get?
StandardTry it yourself first
A, B and C can bund a field alone in 12, 20 and 30 days. All three start together but C falls ill and leaves after 2 days; A and B finish the rest. The wage ₹24,000 is shared in the ratio of work. Find B's share.
StandardTry it yourself first
A alone can put up a fence in 20 days. He starts alone and after 5 days B joins him; together they finish the job in 9 more days. The wage ₹9,600 is shared in the ratio of work. How much does B get?
StandardTry it yourself first
A alone can clean a dam in 30 days and B alone in 45 days. A worked the first 6 days, then B replaced him for 12 days, and C finished the rest alone in 8 days. The total wage was ₹18,000. How much does C get?
StandardTry it yourself first
A alone can build a culvert in 20 days and B alone in 30 days. They start together, but A stays absent for 5 days in between. When the job is done, ₹8,400 is shared in the ratio of work. How much does A get?
◭ Diagram
Who was at work on which daysABC024681012days
A all along, B for the first part, C for the rest
AdvancedTry it yourself first
The figure shows when three labourers were at work on a drain. Working alone A would need 24 days, B 18 days and C 36 days. The total wage ₹21,600 is shared in the ratio of work. How much does C get?
AdvancedTry it yourself first
A takes 12 days to do a job alone and B takes 20 days alone. With C's help the three finish it together and share a total wage of ₹15,000 in the ratio of work; C receives ₹5,000. In how many days could C alone do the job?
AdvancedTry it yourself first
A alone can do a job in 30 days and B alone in 20 days. They start together; after some days A quits and B finishes the job alone. From start to end it takes 16 days in all. The total wage was ₹15,000. How much does A get?
AdvancedTry it yourself first
A, B and C can dig a pond alone in 20, 30 and 60 days. A works alone for the first 3 days, then B joins and the two work for the next 3 days. Then C also joins and the three finish the job. The wage ₹18,000 is shared in the ratio of work. How much does B get?
StandardTry it yourself first
A alone can build a staircase in 10 days and B alone in 20 days. They start together; after 4 days C, who is twice as efficient as B, takes B's place, and A with C finishes the job. The total wage ₹15,000 is shared in the ratio of work. How much does C get?
3

C. Daily wages, bonus and fine

Questions 24–35

Contracts with fine for absence, bonus for early finish, penalty for delay and overtime.

∑ Formula
x = days worked, N − x = days absent
pay per day worked
fine per day absent
total days
BasicTry it yourself first
A labourer is engaged for 30 days. He gets ₹400 for every working day and ₹100 is deducted as fine for every day he is absent. After 30 days he receives ₹9,000 in all. For how many days was he absent?
BasicTry it yourself first
A contractor pays a labourer ₹550 for each day worked and deducts ₹150 for each day absent. In a spell of 28 days a labourer comes on only 22 days. How much does he receive in all?
StandardTry it yourself first
A craftsman is engaged for 40 days at ₹300 for every day worked and a fine of ₹500 for every day absent. After 40 days he gets nothing (earnings and fine are equal). For how many days was he absent?
StandardTry it yourself first
A contractor is to get ₹60,000 for casting the roof of a hall in 20 days, plus ₹2,000 bonus for every day saved. His gang of 8 workers finishes 3 days early. The whole amount is shared equally in the gang. How much does each worker get?
StandardTry it yourself first
A roadside drain is to be built by 16 labourers in 18 days, for a contract of ₹1,20,000. For every day of delay ₹4,000 is deducted. The contractor employs only 12 labourers (all equally efficient). How much does he finally receive?
StandardTry it yourself first
A, B and C can do a job alone in 30, 20 and 60 days. The three get a contract of ₹18,000 to finish it in 12 days, with ₹600 extra for every day saved. They work together, and the whole amount is shared in the ratio of work. Find C's share.
StandardTry it yourself first
A craftsman earns ₹960 for an 8-hour day. Every hour beyond 8 hours is paid at one and a half times the normal hourly rate. In 6 days he earns ₹7,560 in all. How many hours of overtime did he put in during these 6 days?
StandardTry it yourself first
A contractor takes a plastering job to be done in 24 days: ₹3,000 bonus for each day saved and ₹4,000 fine for each day of delay (for a part of a day the bonus or fine is paid pro rata). His 18 workers alone would take 30 days, so he adds 6 more workers from the start (all equally efficient). What bonus or fine does he get?
AdvancedTry it yourself first
A and B are both engaged for 30 days, at ₹500 for every day worked and a deduction of ₹200 for every day absent. A is absent for only 3 days. Together they receive ₹23,700. For how many days was B absent?
StandardTry it yourself first
A bridge repair contract is for ₹1,25,000 to be done in 25 days, with a fine of ₹800 for every day of delay. In the end the contractor receives ₹1,13,000. In how many days was the work completed?
AdvancedTry it yourself first
A alone can do a job in 30 days and B alone in 45 days. They get a contract of ₹30,000 to finish it in 15 days, with a bonus of ₹1,200 for every day saved. They take C's help and the three working together finish in 12 days. The whole amount (with bonus) is shared in the ratio of work. How much does C get?
◭ Diagram
Days present out of 30A24 daysB27 daysC20 days
Attendance of three labourers
StandardTry it yourself first
The figure shows the attendance of three labourers over 30 days. The pay is ₹450 for each day present, and ₹150 is deducted for each day absent. What is the total payment to the three together?
4

D. Team wages: days × daily wage

Questions 36–47

Ratios of both days and daily wages, category-wise pay, finding a daily wage from the total, and two-equation questions.

∑ Formula
The total is split in the ratio of these products
pay
daily wage (if equal, use the ratio of days only)
days worked (if equal, use the ratio of wages only)
BasicTry it yourself first
P, Q and R worked 6, 8 and 9 days on a warehouse. Their daily wages are in the ratio 5 : 4 : 2. The total wage bill is ₹8,000. How much does Q get?
BasicTry it yourself first
Four labourers worked 12, 15, 18, 21 days on lining a well. All get the same daily wage and ₹19,800 is shared among them. How much does the one who worked 15 days get?
StandardTry it yourself first
4 masons and 6 helpers worked 5 days on a house. The daily wages of a mason and a helper are in the ratio 3 : 2. In all ₹36,000 was paid. What is a mason's daily wage?
AdvancedTry it yourself first
At a contractor's site 6 men and 5 boys earn ₹17,100 in 3 days, while 4 men and 9 boys earn ₹22,000 in 4 days. How much will 5 men and 7 boys earn in 6 days? (Everyone in a category has the same daily wage.)
StandardTry it yourself first
A's daily wage is 20% more than B's. A worked 10 days and B worked 12 days on an irrigation channel. Together they received ₹14,400. What is A's daily wage?
BasicTry it yourself first
Three labourers A, B and C worked 9, 12, 15 days respectively on the wall of an enclosure. All get the same daily wage and the total fixed is ₹40,500. A had already taken ₹1,500 as advance. How much will A get in the final payment?
StandardTry it yourself first
In a factory the numbers of skilled, semi-skilled and unskilled workers are in the ratio 2 : 3 : 5 and their daily wages are ₹900, ₹600 and ₹400. There are 30 workers in all. What is the average daily wage of a worker?
StandardTry it yourself first
A culvert contract is worth ₹84,000, of which 25% was spent on material. The rest was shared among three labourers in the ratio of their days of work (6, 8, 10). How much does the one who worked the most days get?
AdvancedTry it yourself first
The daily wages of a man and a woman are in the ratio 7 : 5. 12 men and 15 women working 8 days earn ₹1,27,200 in all. If 10 men and 20 women work for 6 days, what is the total payment?
◭ Diagram
Days workedA14 daysB10 daysC8 daysD6 days
Days worked by four labourers
StandardTry it yourself first
The figure shows the days worked by four labourers. All have the same daily wage and ₹22,800 was paid in all. How much more did the labourer with the most days get than the one with the fewest?
AdvancedTry it yourself first
A, B and C earn daily wages in the proportion 4 : 5 : 6. They worked 15, 12, 10 days respectively on fencing a garden. The total wage is ₹18,000. How much does B get?
AdvancedTry it yourself first
Three labourers A, B and C worked 5, 6, 8 days respectively. B's daily wage is ₹100 more than A's and C's is ₹100 more than B's. Together they received ₹7,900. How much did C receive?
5

E. Chain rule: men, days, hours and work

Questions 48–60

When the amount of work, the workers, the hours and the efficiency all change together.

∑ Formula
Same kind of job: the rate of work is the same on both sides
number of workers
days
hours per day
efficiency per worker
amount of work
BasicTry it yourself first
12 labourers working 8 hours a day lay the roof of a godown in 15 days. In how many days will 20 labourers working 6 hours a day lay the same roof?
BasicTry it yourself first
24 labourers working 5 hours a day build the bunds of a field in 9 days. If 20 labourers have to do the same work in 6 days, for how many hours a day must they work?
StandardTry it yourself first
12 labourers dig 150 m of a canal in 10 days. In how many days will 18 labourers (same efficiency, same hours a day) dig 270 m?
StandardTry it yourself first
7 craftsmen working 6 hours a day make the lattice of a temple in 15 days. Now 9 craftsmen want to make a similar lattice in 12 days. How long must they work each day?
StandardTry it yourself first
The efficiency of a skilled craftsman and an unskilled one is in the ratio 4 : 3. 12 skilled craftsmen working 8 hours a day build a stage in 15 days. In how many days will 20 unskilled craftsmen working 6 hours a day build it?
StandardTry it yourself first
5 pumps running 8 hours a day fill 4 identical tanks in 6 days. How many such pumps are needed to fill 14 such tanks in 10 days, running 7 hours a day?
StandardTry it yourself first
20 labourers build a first road in 12 days. The second road is one and a half times as big and, because the ground is harder, each labourer is 20% less efficient there. In how many days will 30 labourers finish it?
AdvancedTry it yourself first
40 labourers working 9 hours a day build of a road in 24 days. The rest must be finished in only 12 days, and now there are 48 labourers. For how many hours a day must they work? (All equally efficient.)
AdvancedTry it yourself first
15 workers working 8 hours a day, 6 days a week, raise the frame of a building in 10 weeks. In how many weeks will 20 workers raise it if they work 9 hours a day but only 5 days a week?
AdvancedTry it yourself first
A digging machine does the work of 12 labourers. Running 6 hours a day it digs a pond in 8 days. The machine is removed and the same pond is to be dug by labourers working 8 hours a day in 9 days. How many labourers are needed?
◭ Diagram
Hours worked per day (per worker)Mon6Tue8Wed8Thu10Fri6Sat6
One week's schedule
AdvancedTry it yourself first
The figure shows the hours each worker puts in on each day of a week (the same pattern repeats every week). A contract has 5,280 man-hours of work in all. In how many weeks will 12 workers finish it working to this schedule?
BasicTry it yourself first
4 printing machines running 8 hours a day print 9,600 pages in 5 days. How many pages will 6 such machines print running 7 hours a day for 6 days?
AdvancedTry it yourself first
20 labourers working 9 hours a day complete the repair of a dam in 14 days. If 30 labourers work 7 hours a day for 8 days, what percentage of the repair will they complete?
6

F. Men, women and boys

Questions 61–73

Equivalences like "x men = y women", mixed gangs, and efficiency ratios from two situations.

RememberConvert everyone into one unit: give the weakest worker a number of units that keeps the others whole. Then work = total units × days.
BasicTry it yourself first
4 men or 6 women can weed a field in 30 days. In how many days will 6 men and 9 women together weed it?
BasicTry it yourself first
The work of 2 men equals the work of 3 women. 10 men paint a bridge in 18 days. In how many days will 18 women do the same job?
StandardTry it yourself first
The work of 4 men equals the work of 6 women, and the work of 3 women equals the work of 5 boys. One boy alone does the whole job in 90 days. In how many days will 2 men, 3 women and 5 boys together do it?
StandardTry it yourself first
10 men and 15 women clean a warehouse in 8 days. 12 women alone would do it in 20 days. In how many days will 5 men alone do it?
StandardTry it yourself first
The work of one man equals that of 2 women or 4 boys. Wages are paid in proportion to work, and a man gets ₹720 a day. What is the total payment to a gang of 2 men, 3 women and 4 boys working 10 days?
StandardTry it yourself first
One man alone can clean a well in 12 days, a woman alone in 20 days and a boy alone in 60 days. How many boys must join 1 man and 1 woman so that the whole job is done in 4 days?
StandardTry it yourself first
A woman's efficiency is 25% less than a man's and a boy's is 40% less than a woman's. 6 men, 8 women and 10 boys do the brickwork of a building in 14 days. In how many days will 11 men alone do it?
◭ Diagram
Units per day (each square = 1 unit)ManWomanBoy
Daily work of one person
AdvancedTry it yourself first
The figure shows the daily work of one man, one woman and one boy. A drain job needs 1,170 units of work. In how many days will 5 men, 6 women and 8 boys do it together?
AdvancedTry it yourself first
A man's work and a woman's work are in the ratio 3 : 2. 8 men and 12 women begin a dam job. After 6 days 2 men and 4 women leave, and those who remain finish the rest in 18 days. In how many days would 10 men alone have done the whole job?
AdvancedTry it yourself first
6 men and 5 women build a roadside wall in 12 days, while 9 men and 5 women build the same wall in 9 days. What is the ratio of a man's efficiency to a woman's?
AdvancedTry it yourself first
3 men, or 4 women, or 6 boys can do the masonry of an irrigation tank in 24 days. In how many days will 2 men, 4 women and 6 boys together do it?
AdvancedTry it yourself first
The efficiencies of a man and a woman are in the ratio 3 : 2. A gang of 12 men and 15 women completes a school floor contract for ₹2,97,000, and the money is divided in the ratio of work (all worked equal days). How much do all the women together get?
AdvancedTry it yourself first
1 man and 4 women dig a well in 20 days, while 3 men and 2 women dig the same well in 15 days. In how many days will 6 men and 8 women together dig it?
7

G. Changing workforce in stages

Questions 74–86

Digging, wall, road, trench and canal jobs where the workers or the pace change from stage to stage.

RememberWork of a stage = workers × days (man-days). Add the stages to get the total; "work left ÷ days left" gives the workers needed.
◭ Diagram
Labourers on a canal stage by stage206 d308 d254 dwidth = days · height = labourers
Number of labourers in three stages
BasicTry it yourself first
The figure shows three stages of a canal job (width = days, height = labourers). The contractor pays each labourer ₹600 a day. What is the total labour cost of the whole job?
BasicTry it yourself first
15 labourers build a wall in 24 days. If 9 labourers (equally efficient) work on that wall for 8 days, what percentage of the wall gets built?
StandardTry it yourself first
A road was to be built by 40 labourers in 40 days. After 20 days only 40% of the road has been built. How many extra labourers are needed to finish the rest on time? (All equally efficient.)
StandardTry it yourself first
12 masons build of a compound wall in 10 days. The number of masons is then raised to 25. How many more days will the rest of the wall take?
StandardTry it yourself first
30 labourers are digging a trench for a pipeline. The first 300 m is soft soil where a labourer digs 5 m a day; the next 270 m is hard soil where a labourer digs only 3 m a day. In how many days is the whole trench dug?
◭ Diagram
Number of labourers4520 d6020 d50?width = days · height = labourers
The days of the last stage are unknown
StandardTry it yourself first
A canal was to be dug by 45 labourers in 60 days. They worked 20 days, then the strength was raised to 60 for the next 20 days (figure). After that 50 labourers did the rest. In how many days in all was the canal finished?
StandardTry it yourself first
A 9 km road is being built. 60 labourers built km in 12 days. At the same rate per labourer, how many extra labourers are needed to build the rest in 30 days? (The original 60 labourers stay on the job.)
AdvancedTry it yourself first
In repairing a reservoir, 24 labourers first did of the whole job in 8 days. Then 18 labourers did the next of the whole job, and finally 30 labourers finished the rest. In how many days was the whole job done?
AdvancedTry it yourself first
A 868 m tunnel is being dug from both ends at once. At the first end 16 labourers dig 2 m a day each; at the second end 20 labourers dig m a day each. At what distance from the first end do the two gangs meet?
◭ Diagram
Stages so far3010 d4012 dwidth = days · height = labourers
Two stages are complete
AdvancedTry it yourself first
A dam repair needs 1,500 man-days of work in all. The figure shows two stages already completed. In the third stage 36 labourers are employed. How many days will the third stage take?
AdvancedTry it yourself first
80 labourers were to dig a canal in 25 days. After 10 days, 20 of them were sent elsewhere for exactly 5 days (days 11 to 15) and then returned. Then all 80 did the rest of the work; the job may end part-way through a day, so the answer may be a fraction of a day. By how many days was the job late?
AdvancedTry it yourself first
80 labourers built of an approach road to a railway bridge in 24 days. Then 20% of the labourers left. In how many days will the remaining labourers finish the rest?
StandardTry it yourself first
On a highway 35 labourers work the day shift and 25 the night shift. In poor light a night labourer is 20% less efficient than a day labourer. The whole job needs 4,400 man-days at day-shift efficiency. How many days will the job take?
8

H. Stages with different efficiencies

Questions 87–99

Pace rising or falling midway, a machine arriving, fatigue and new methods.

RememberMethod: (1) find the pace from the first stage's work and time; (2) new pace = old pace × change; (3) work left ÷ new pace = time left.
BasicTry it yourself first
A labourer fences of a field in 6 days. He then gets a new tool that doubles his speed. How many more days does he need to fence the rest?
BasicTry it yourself first
A machine completes 60% of an order in 9 days. After repair its speed rises by 50%. How many days will it take to finish the rest of the order?
StandardTry it yourself first
A labourer alone can whitewash a tank in 20 days. He works at normal pace for 8 days, then because of the heat his efficiency falls by 20%. In how many days in all is the tank done?
StandardTry it yourself first
A alone can paint a road divider in 36 days and B alone in 18 days. They start together. After 4 days B's efficiency drops to half because of a hand injury. In how many days in all is the job finished?
StandardTry it yourself first
A craftsman alone makes a wall mural in 20 days. After finishing half the work he adopts a new method that raises his speed by 25%. In how many days in all is the mural complete?
StandardTry it yourself first
A tractor ploughs a 150-acre field. In the first 60 acres it ploughs 6 acres an hour; after a change of plough it does the remaining 90 acres at 15 acres an hour. How many hours does the whole field take?
StandardTry it yourself first
10 labourers build of a road in 12 days. Then a machine arrives that does the work of 5 labourers. In how many days will the machine and the 10 labourers together build the rest?
◭ Diagram
Share of the job done each day (%)Day 112%Day 212%Day 316%Day 420%
Progress in the first four days
StandardTry it yourself first
The figure shows the daily progress of a job in its first four days. If from the fifth day the work goes on at the pace of the fourth day, how many more days will it take to finish?
AdvancedTry it yourself first
A is 25% more efficient than B, and A alone can build a culvert in 20 days. A starts alone and leaves when of the work is done; B finishes the rest alone. In how many days in all is the culvert built?
◭ Diagram
Units made each day (first 5 days)Day 110Day 212Day 314Day 416Day 518
Each day 2 units more than the day before
AdvancedTry it yourself first
The figure shows a craftsman's output in his first five days. The pattern continues: each day he makes 2 units more than the day before. In how many days is an order of 220 units complete?
BasicTry it yourself first
A machine operator makes 40 units an hour in his normal 8 hours. Working 2 extra hours every day, he tires and makes only 30 units an hour in those hours. How many days does he need for an order of 1,520 units?
StandardTry it yourself first
A furnace can finish an order in 20 hours at full speed. But for the first 4 hours it runs at only 75% speed and after that at full speed. How many hours in all will the order take?
AdvancedTry it yourself first
A craftsman alone can do a job in 24 days. He works 8 days, then buys a new tool that raises his efficiency, and finishes the rest in 10 days. By what percentage did the tool raise his efficiency?
9

I. Shifts and cycles

Questions 100–110

Workers in turn, in blocks, on day and night shifts and with weekly holidays: on which day is the job done?

RememberMethod for cycles: (1) turn the job into LCM units; (2) find the units of one full cycle; (3) count full cycles; (4) match the leftover with the next workers one by one.
BasicTry it yourself first
A, B and C can do a job alone in 12, 18 and 36 days. They take turns working one full day each, in the order A, then B, then C, then A again, and so on. In how many days is the job finished?
StandardTry it yourself first
A, B and C can do a job alone in 12, 16 and 24 days. The order is one day each of A, B, C, then A, B, C again. On which day is the job finished? (Count the day on which it finishes as a whole day.)
StandardTry it yourself first
A, B and C can do a job alone in 8, 20 and 10 days. They work one day each in turn (A, B, C, A, ...) till it is finished and share ₹9,000 in the ratio of work done. How much does C get?
StandardTry it yourself first
A, B and C can do a job alone in 12, 18 and 9 days. The work goes in this order: A for 2 days, then B for 3 days, then C for 1 day, and this order repeats. In how many days is the job done? (Count a part of a day as a full day.)
StandardTry it yourself first
A alone working 8 hours a day can complete a boring job in 15 days, and B alone working 6 hours a day can do it in 10 days. Every day A works a 5-hour shift and then B works a 5-hour shift. In how many days is the job done?
◭ Diagram
The pattern of the first 9 daysABC02468days
Each works one day in turn
StandardTry it yourself first
The figure shows the order in which three labourers work, and it keeps repeating. A, B and C alone can do the same job in 18, 24 and 36 days. How many days will the whole job last?
AdvancedTry it yourself first
A and B work every day on a construction job. C helps them every third day (days 3, 6, 9, ...). A, B and C alone can do the job in 20, 30 and 15 days. In how many days is it finished? (Count a part of a day as a full day.)
AdvancedTry it yourself first
A alone can do a job in 18 days and B alone in 36 days. They start working together on a Monday, but every Sunday is a holiday. How many calendar days pass before the job is done (counting the Sunday holiday)?
AdvancedTry it yourself first
A alone can do a job in 24 days and B alone in 40 days. A, B and C work one day each in turn (A, B, C, A, ...) and the job is finished exactly at the end of day 18. In how many days can C alone do the job?
StandardTry it yourself first
Gang X of 20 labourers can clean a pond in 40 days. Gang Y of 30 labourers (equally efficient) also works. The gangs work in turn: first 2 days gang X, next 2 days gang Y, then X again, then Y, ... In how many days is the cleaning finished?
AdvancedTry it yourself first
A, B and C can do a job alone in 15, 20 and 30 days. They work one day each in turn (A, B, C, A, ...). What fraction of the job remains after 10 days?
10

J. Negative work (someone undoes it)

Questions 111–121

When someone undoes, damages or reverses the work: use the net rate.

∑ Formula
Time = 1 ÷ net rate
work a day (+ for building, − for undoing)
BasicTry it yourself first
A labourer alone can build a mud wall in 12 days. But every day a goat knocks down so much of it that the goat alone would bring down the whole wall in 36 days. If both keep doing their work daily, in how many days will the wall be standing complete?
StandardTry it yourself first
A alone can build an embankment in 20 days. When B keeps breaking part of it every day, the embankment is completed in 60 days. If B only broke it, in how many days would he demolish all of it?
StandardTry it yourself first
A and B alone can build a platform in 20 and 30 days. Their novice helper C spoils the brickwork so much each day that C alone would demolish the whole platform in 60 days. If all three keep working, in how many days is the platform finished?
StandardTry it yourself first
A labourer raises a retaining wall by 6 m every day, but 2 m of it collapses each night. The wall has to reach 26 m. On which day is it complete? (Work stops as soon as the height is reached.)
StandardTry it yourself first
A alone can build a boundary wall in 18 days. B damages it each day so much that B alone would bring the whole wall down in 45 days, but he does so only for the first 10 days and then leaves. In how many days in all is the wall completed?
◭ Diagram
Units per day (red = undoing)A+6B+5C−2D+3
Daily contribution of four workers
StandardTry it yourself first
The figure shows the daily contribution of four workers: A, B and D build while C undoes some work every day. The job is 36 units and all four keep working. In how many days is it completed?
StandardTry it yourself first
A and B together fill a pit in 8 days. When C also comes and keeps digging out the filled earth every day, the pit takes 12 days to fill. In how many days would C alone empty a completely filled pit?
AdvancedTry it yourself first
A alone can build a roof in 12 days and B alone in 18 days. A third man C breaks so much each day that C alone would bring the whole roof down in 36 days. The three keep working till the roof is complete. The contractor shares ₹15,000 between A and B only, in the ratio of the work they built. How much does A get?
AdvancedTry it yourself first
Labourers dig 12 m of a drain in a day, but every night soil slides in from the slope and refills 2 m. How many days will it take to finish 112 m of digging?
◭ Diagram
Daily change in the share of the job (%)Day 1+12%Day 2+14%Day 3−6%Day 4+16%Day 5+14%
Storm damage on day 3
AdvancedTry it yourself first
The figure shows the changes (in % of the whole job) over five days of a bridge construction; on the third day a storm destroyed some work. The same five-day pattern keeps repeating. How many days does it take to reach 100%?
StandardTry it yourself first
A craftsman can do a job in 24 days. But 25% of each day's work turns out wrong and has to be redone (redoing takes the same time, and the redone work is wrong at the same rate). How many days will it take to complete all the work correctly?
11

K. Extra days and days saved

Questions 122–133

The change in days when workers are reduced or added, strength that changes daily, and ration-type questions.

RememberAlways keep man-days (or person-days) equal: work left = workers left × days left. When the strength changes midway, "work left" becomes the new base.
BasicTry it yourself first
A number of labourers can finish a dam repair in 24 days. Had there been 6 more labourers, the work would have finished 4 days sooner. How many labourers were there originally?
BasicTry it yourself first
A contractor expected 18 labourers to build a road in 20 days. Only 12 labourers turned up. By how many days will the road take longer than planned?
StandardTry it yourself first
40 labourers were to dig a canal in 24 days. After 9 days, 10 labourers left. By how many days will the rest take longer than planned to finish the work?
StandardTry it yourself first
30 labourers would lay a bridge deck in 40 days. After 10 days 15 more labourers join. By how many days is the work finished ahead of plan?
StandardTry it yourself first
On a culvert job, 8 labourers work on the first day and 2 more join on every following day. The job needs 198 man-days. In how many days is it finished?
AdvancedTry it yourself first
Some labourers promised to finish a tunnel repair in 8 days. But 2 labourers left at the end of every day, and the job took 12 days. How many labourers were there at the start?
BasicTry it yourself first
A relief camp has rations for 500 people for 36 days. After 12 days, 100 people leave the camp. For how many more days will the remaining rations last the people left?
AdvancedTry it yourself first
A hostel had grain for 120 students for 40 days. After 10 days 30 students went home, but the grain that is left must now last the remaining students 45 more days. By what percentage must each student's daily ration be reduced?
AdvancedTry it yourself first
Some labourers can finish masonry of a godown in 40 days. With 5 more labourers it would be finished 4 days earlier. With 5 fewer labourers, how many days longer would it take?
◭ Diagram
Number of labourers (actual)6010 d42?width = days · height = labourers
Stage 1 is over, the days of stage 2 are unknown
AdvancedTry it yourself first
A retaining wall was to be built by 60 labourers in 24 days. As the figure shows, after 10 days the strength fell to 42. By how many days will the work be late?
StandardTry it yourself first
36 labourers were to cast a godown roof in 30 days. After 15 days it is found that of the work is done. How many labourers can now be released and the work still finish on time?
AdvancedTry it yourself first
A gang of 12 labourers had to finish a job in 30 days. But on every third day (3, 6, 9, ...) 3 of them are on leave. By how many days will the job be late? (Count the day on which the job finishes as a whole day.)
12

L. Percentage changes

Questions 134–145

The effect of percentage changes in workers, hours, efficiency, days and amount of work.

∑ Formula
All factors multiply (never add); work = workers × hours × days × efficiency is fixed
percentage rise (+) or fall (−)
BasicTry it yourself first
A contractor raises the number of labourers on a job by 25% (all equally efficient, same hours a day). By what percentage do the days needed to finish the job fall?
BasicTry it yourself first
A factory cuts the daily working hours by 20% (same workers, same efficiency). By what percentage do the days needed for an order increase?
StandardTry it yourself first
On a job the labourers are increased by 50% and the daily hours are reduced by 20%. By what percentage do the days needed for the job fall? (Exact value.)
StandardTry it yourself first
A gang finishes a job in 30 days. A new machine raises each labourer's efficiency by 25%, but the gang is cut by 20%. How many days will the same job take now?
StandardTry it yourself first
For a job the number of labourers is cut by 20% and the days allowed are also cut by 20%. By what percentage must the daily hours be raised to complete the same work?
StandardTry it yourself first
A gang does a job in 25 days. The same gang now takes up a job 50% bigger, but with new techniques its efficiency has risen by 25%. In how many days will the new job be done?
AdvancedTry it yourself first
In a scheme the daily wage per labourer rises 25%, the number of labourers falls 20% and the days of work rise 20%. By what percentage does the total wage bill change?
AdvancedTry it yourself first
A job must now be finished in 40% less time than before, and the labourers have been increased by 20%. By what percentage must the daily hours be raised?
◭ Diagram
As % of the original (before = 100%)Workers125%Hours80%Efficiency125%
Three factors of the new plan
AdvancedTry it yourself first
The figure shows three factors of a new work plan compared with the old plan (100%). If the amount of work is the same, by what percentage do the days needed fall compared with before?
AdvancedTry it yourself first
A gang does a job in 54 days. The contractor adds 20% more labourers, but because of crowding the efficiency of the whole gang falls by 10%. In how many days will the job now be done?
StandardTry it yourself first
A contractor raises the labourers on a job by 60%, but because of crowding each labourer's efficiency falls by 25%. Each labourer's daily wage stays the same. By what percentage does the total wages paid for completing the same whole job rise, compared with before?
AdvancedTry it yourself first
The amount of a job has risen by 35% and it has to be completed in 40% fewer days than before (same hours and efficiency). By what percentage must the labourers be increased?
13

M. Comparing contractors and plans by cost

Questions 146–157

Which is cheaper: two contractors, machine versus labour, overhead, rent and piece rates.

RememberWork out each option's total cost separately (labourers × rate × days + one-time and daily extras), then subtract. "Faster" and "cheaper" are not the same thing.
BasicTry it yourself first
A panchayat wants a community hall built. Contractor Mehta will employ 20 labourers at ₹500 per labourer-day and finish in 30 days. Contractor Joshi will employ 25 labourers at ₹480 per labourer-day and finish in 24 days. Which contractor is cheaper, and by how much?
BasicTry it yourself first
To level a field, a machine at a rent of ₹4,000 a day does the job in 18 days. 15 labourers at ₹450 a day each would do it in 14 days. How much money does the machine save?
StandardTry it yourself first
Mason Ravi alone plasters a wall in 15 days at a daily wage of ₹700. Mason Sunil alone does the same job in 24 days at ₹450 a day. Who costs less, and by how much?
StandardTry it yourself first
A alone can do a job in 12 days (₹600 a day), B alone in 18 days (₹400 a day) and C alone in 8 days (₹950 a day). By how much is employing A and B together cheaper than employing C alone? (Wages are paid pro rata for a part of a day.)
StandardTry it yourself first
A mixer machine has a one-time transport cost of ₹30,000 and a running cost of ₹1,000 a day. A gang of labourers for the same work costs ₹2,500 a day. For a job of how many days are the total costs of the two equal?
StandardTry it yourself first
For a school building contractor Bhatt offers ₹4,00,000 and 40 days, and contractor Khan offers ₹3,80,000 and 50 days. Until the building is ready the school pays ₹3,000 a day for rented space. On total cost (contract + rent), which offer is cheaper and by how much?
AdvancedTry it yourself first
A gang X of 24 equally efficient labourers does a job in 15 days. A gang Y of 18 such labourers would take longer. Each labourer gets ₹600 a day and the site overhead is ₹2,000 a day. By how much is gang Y's total cost more than gang X's?
◭ Diagram
Time and daily chargeA12 days · ₹9,000/dayB15 days · ₹7,000/dayC20 days · ₹5,200/day
Offers of three contractors
AdvancedTry it yourself first
The figure shows the days three contractors need and their daily charges. By how many rupees is the cheapest contractor cheaper than the second cheapest?
AdvancedTry it yourself first
A skilled craftsman does 3 units a day and takes ₹900 a day. An unskilled labourer does 1 unit a day and takes ₹400 a day. For 120 units of work, by how much is employing one skilled craftsman cheaper than employing 2 unskilled labourers?
AdvancedTry it yourself first
A nursery has a job of filling 540 pots. On a time rate, a labourer takes ₹600 a day and fills 15 pots a day. On a piece rate, another labourer takes ₹50 per pot and fills 18 pots a day. By how much does the piece-rate worker cost more than the time-rate worker?
BasicTry it yourself first
A contractor needs a concrete mixer for a 40-day job. Hiring it costs ₹2,400 a day, while buying costs ₹60,000 once plus ₹600 a day to run (ignore the resale value). How much does buying save compared with hiring?
AdvancedTry it yourself first
Contractor P alone can do a job in 30 days (₹600 a day) and Q alone in 20 days (₹1,000 a day). The owner has P do of the job first and Q do the rest. By how much does this cost more than giving the whole job to P alone?
14

N. Which statement is correct, and reverse questions

Questions 158–170

Statements I/II, comparing two quantities, sufficiency of data, and finding an input from the answer.

RememberIn statement questions test each statement separately, then choose the option. If data look suspicious, check first: the time together is always less than the smaller alone-time.
StandardTry it yourself first
Working alone, A needs 12 days for a job and B needs 18 days. They do it together and share ₹9,000 in the ratio of work.<br>I. A gets ₹5,400.<br>II. Together they finish the job in 9 days.<br>Which statement(s) is/are correct?
StandardTry it yourself first
I. A job that 12 labourers do in 10 days working 8 hours a day can be done by 16 labourers working 6 hours a day in 10 days.<br>II. A job that 15 labourers do in 14 days working 5 hours a day can be done by 25 labourers working 6 hours a day in 7 days. (All equally efficient.)<br>Which statement(s) is/are correct?
StandardTry it yourself first
I. A labourer can build a wall in 12 days and a goat knocks it down in 36 days. If both do their work daily, the wall will stand complete in exactly 18 days.<br>II. Another wall can be built by the labourer in 10 days and knocked down by the goat in 40 days; it will then stand complete in exactly 14 days.<br>(Statements give exact times; part of a day counts.)<br>Which statement(s) is/are correct?
StandardTry it yourself first
A and B together do a job in 24 days. A alone can do it in 40 days. The total wage is ₹20,000. How much does A get?
StandardTry it yourself first
Four sets of figures are given for a job done by Ravi and Sunil. In which set do the figures contradict each other?
StandardTry it yourself first
Ravi, Sunil and Hari can do a job alone in 8, 12 and 24 days. All three work the same number of days together and share the wages in the ratio of work. Which statement is correct?
AdvancedTry it yourself first
A contractor says: "If I cut the labourers by 25%, this job will take 6 more days." (Everything else stays the same.) In how many days is the job done with all the labourers?
AdvancedTry it yourself first
Question: In how many days will A and B together finish a job?<br>I. A alone does the job in 12 days.<br>II. A is twice as efficient as B.<br>III. B alone does the job in 24 days.<br>What is the minimum number of these statements needed to answer the question?
AdvancedTry it yourself first
A and B together did a job and earned ₹18,000, of which A got ₹7,200 (in the ratio of work, both working the same number of days). A alone can do the job in 30 days. In how many days can B alone do it?
StandardTry it yourself first
Quantity I: days in which A (21 days alone) and B (28 days alone) finish a job together.<br>Quantity II: days in which C (14 days alone) and D (35 days alone) finish a similar job together.<br>What is the relation between the two quantities?
StandardTry it yourself first
Quantity I: A (12 days alone) and B (24 days alone) together earned ₹18,000; A's share.<br>Quantity II: C (5 days alone) and D (15 days alone) together earned ₹14,400; C's share.<br>(Both pairs worked the same number of days.) What is the relation between the two quantities?
◭ Diagram
Wages received by the threeA₹5,400B₹3,600C₹1,800
All worked equal days; wages follow the work
AdvancedTry it yourself first
The figure shows the wages received by three labourers (all worked equal days and the wages follow the work).<br>I. A's efficiency was three times C's.<br>II. B did 40% of the total work.<br>Which statement(s) is/are correct?
AdvancedTry it yourself first
A supervisor says: "If we increase the labourers by 20%, the work will be finished 4 days sooner." (Everything else stays the same.) In how many days will the present labourers finish the work?