← Maths

Time and Work Questions

210 Questions with Answers and Solutions · SSC, Banking, Railway

14 Part210 practice questions

This page has 210 fresh Time and Work questions at the level of SSC CGL, CHSL, CPO, MTS, bank PO and railway exams, from basic to advanced, in 14 types. The answer and the step-by-step solution of every question open after you choose an option.

How to use it: solve each question on paper first, then pick an option. The short hint line under some questions gives the exam shortcut. Diagram questions ask you to read the data from a bar or graph.

RememberRemember four things before you start: (1) A's one-day work is . (2) Two workers together take days. (3) Efficiency is inverse to time. (4) Take the total work as the LCM of the days and you avoid fractions.
1

A. One worker and two workers together

Questions 1–16

Time for one, time for two together, one-day work, comparisons and mixed-number times.

∑ Formula
Two workers together finish the whole job in days
days A and B take alone
days they take together
BasicTry it yourself first
Meena can paint a boundary wall alone in 10 days and Rohit alone in 15 days. Working together, in how many days will they finish painting the wall?
BasicTry it yourself first
A cobbler completes a shop's shoe-repair order in 24 days; his son alone completes the same order in 8 days. If both work on it together, how many days will the order take?
BasicTry it yourself first
A factory has two identical machines. Each machine alone completes a certain order in 18 hours. Running together, how many hours do they need for the same order?
StandardTry it yourself first
One paddy-harvesting machine can cut a field alone in 7.5 days and a second machine alone in 5 days. Working together, in how many days will the field be harvested?
StandardTry it yourself first
Two masons would take 14 days and 21 days respectively to build the walls of a room, each working alone. How many days will they take working together?
StandardTry it yourself first
Two pairs compete on the same job. Pair 1: Seema (alone 12 days) and Neeta (alone 24 days). Pair 2: two sisters, each of whom can do the job alone in 15 days. Which pair finishes first?
StandardTry it yourself first
A washerman and his helper take 9 hours and 18 hours respectively to wash a heap of clothes, each working alone. What part of the heap will they wash in one hour working together?
StandardTry it yourself first
One road-repair crew can finish a patching job in 2 weeks and another crew in 10 days. Assume both crews work all seven days of the week. How many days will they take working together?
StandardTry it yourself first
Two carpenters build a wooden almirah alone in 6 days and 12 days respectively. Working together, in how many days will half of the almirah be ready?
StandardTry it yourself first
Chanda can weed and dig a 12-bed garden alone in 15 days and her friend in 30 days. By how many days earlier than Chanda alone will the job be finished if the two work together?
AdvancedTry it yourself first
A packing room has 4 machines: two of type X, each of which seals a batch alone in 40 minutes, and two of type Y, each of which seals the same batch alone in 24 minutes. If all four run together, in how many minutes is one batch sealed?
AdvancedTry it yourself first
A and B draw one copy of a 6-sheet map alone in 8 days and 24 days respectively. Working together they first make one copy and then a copy of a map three times as large (the work is proportional to the size of the map). How many days does the whole work take? (Both keep a steady pace.)
StandardTry it yourself first
Anil can dig the irrigation channels of a field alone in 12 days. His partner takes twice as long as Anil for the same job. In how many days will the channels be ready if they work together?
AdvancedTry it yourself first
A completes 2 identical jobs (500 posters each) in 18 days and B completes 3 jobs of the same kind in 18 days. In how many days will they complete 5 such jobs working together?
BasicTry it yourself first
A plasterer can coat the walls of a shop in 16 days and his apprentice in 48 days. If both work together, how many days will the walls take?
AdvancedTry it yourself first
Sudha takes 7 days to arrange the shelves of a library alone and Reema takes days alone. How many days will they take working together?
2

B. Finding the other worker's time

Questions 17–30

Joint time and one solo time given: find the other, with fraction answers, hours-minutes, differences and bounds.

∑ Formula
If A alone and the joint time are known, B alone takes days
days A takes alone
days together ()
days B takes alone
BasicTry it yourself first
Lalit and Kamal together bind a batch of books in 12 days. Lalit alone does it in 20 days. How many days will Kamal alone take?
BasicTry it yourself first
Ravi and Sunil together clean a pond in 6 days. Ravi alone can do it in 10 days. In how many days can Sunil alone do it?
StandardTry it yourself first
Two tailors together stitch all the clothes for a wedding in 4 days. The senior tailor alone can do it in 7 days. How many days will the junior tailor alone take?
StandardTry it yourself first
A painter and his assistant together finish the outside painting of a house in 4.8 days. The painter alone can do it in 8 days. In how many days can the assistant alone do it?
StandardTry it yourself first
Shabnam and Nazia together arrange all the cartons in a godown in 5 days. Shabnam alone does it in 15 days. By how many days is Nazia's solo time shorter than Shabnam's?
StandardTry it yourself first
P and Q together mow the grass of a school ground in 10 days. Q alone mows it in 25 days. In how many days can P alone do it?
StandardTry it yourself first
Aarti and Babita together dig a village pipeline trench in 9 days. Aarti alone can do it in 12 days. What is the ratio of their efficiencies, Aarti : Babita?
AdvancedTry it yourself first
Neha and Pooja together finish decorating a 400-seat wedding hall in 3 hours 20 minutes. Neha alone can do the decoration in 10 hours. In how many hours can Pooja alone do it?
StandardTry it yourself first
Shyam and Ghanshyam together complete of the repairs of a boat jetty in 3 days. Shyam alone can do the whole repair in 20 days. In how many days can Ghanshyam alone do the whole repair?
AdvancedTry it yourself first
A father and his daughter together whitewash the whole house in 12 days. The father alone does the job in 30 days. Working alone, by how many days earlier than her father will the daughter finish?
AdvancedTry it yourself first
A can do a job alone in 30 days. Working together, A and B need strictly less than 10 days (exactly 10 days is not allowed). B alone takes a whole number of days. Which one of these values CANNOT be the number of days B takes alone?
StandardTry it yourself first
Heera and Moti together polish a lot of gold ornaments in days. Heera alone can polish them in 10 days. In how many days can Moti alone do it?
BasicTry it yourself first
Two printers together print a school's entire set of question papers in 18 hours. The first printer alone takes 72 hours. How many hours will the second printer alone take?
AdvancedTry it yourself first
Ranbir takes twice as long as Gurmeet to harvest a field. Together they harvest the field in 6 days. In how many days can Ranbir alone harvest it?
3

C. Three workers together and the third worker

Questions 31–44

Joint time of three, the third one's solo time, absence, approximation and efficiency ratios.

∑ Formula
With three workers, add their one-day works and invert
days each takes alone
days all three take together
BasicTry it yourself first
Three farmers can sow a 60-acre field alone in 10, 12 and 15 days respectively. Working together, in how many days will the field be sown?
BasicTry it yourself first
Three machines complete an order of 5,000 parts in a factory in 30, 20 and 60 hours respectively, each working alone. In how many hours will the order be finished if all three run together?
StandardTry it yourself first
A, B and C together paint a 150-metre bridge in 5 days. A alone can do it in 12 days and B alone in 15 days. In how many days can C alone do it?
StandardTry it yourself first
Three weavers can complete an order of 300 shawls alone in 15, 18 and 24 days respectively. If all three work as one team, what is the time needed, rounded to the nearest whole day?
StandardTry it yourself first
Three children take 6, 12 and 18 days respectively to build a model of a 24-room palace alone, so their times are in the ratio . How many days will the model take if all three build it together?
StandardTry it yourself first
A, B and C can build a fence alone in 8, 12 and 24 days respectively. By how many days earlier is the fence ready when all three work than when only A and B work?
StandardTry it yourself first
Three labourers clean a godown alone in 12, 18 and 36 days respectively. If all three work together for 2 days, what fraction of the cleaning is still left?
StandardTry it yourself first
A, B and C together prepare a library catalogue of 2,400 books in 4 days. A alone can prepare it in 8 days and B alone in 12 days. C alone takes how many times as long as A alone?
AdvancedTry it yourself first
Among three artisans, A works twice as fast as B and B works twice as fast as C. Together they carve a temple statue in 8 days. In how many days can C alone carve it?
AdvancedTry it yourself first
P, Q and R can whitewash a government school alone in 10, 15 and 30 days respectively. If R is absent from the very first day and only P and Q work, how many more days does the job take than if all three had worked?
StandardTry it yourself first
Three tractors can plough a large field alone in 18, 24 and 36 days respectively. How many days will the ploughing take if all three work together?
StandardTry it yourself first
Three crews can repair a 90-metre railway crossing alone in 2 weeks, 10 days and 35 days respectively (working all seven days of the week). In how many days will the repair be finished if all three crews work together?
BasicTry it yourself first
Three identical looms, all weaving at the same steady rate, together weave an order in 8 days. In how many days would just 2 of these looms weave the same order?
AdvancedTry it yourself first
P and Q can set up a 20-shelf book-fair stall alone in 10 and 15 days respectively. When a third partner R joins them, the three finish the stall in 4 days. What is the ratio of their efficiencies P : Q : R?
4

D. From pairs to each worker alone

Questions 45–58

A+B, B+C, C+A given: the joint time, each solo time, a fourth member, ratios and statements.

∑ Formula
Add the one-day works of the three pairs and halve — that is the one-day work of all three
each worker's one-day work (as a fraction)
BasicTry it yourself first
A and B together finish a 240-page copying job in 12 days, B and C in 15 days, and C and A in 20 days. In how many days will all three together finish the job?
StandardTry it yourself first
Working in pairs, A and B clean a 3-km canal in 10 days, B and C in 12 days and C and A in 20 days. In how many days can A alone clean the canal?
StandardTry it yourself first
Three friends pack a bundle of 480 old books. Amit and Balbir together take 5 hours, Balbir and Chetan 6 hours, and Chetan and Amit 10 hours. How many hours will Balbir alone take?
AdvancedTry it yourself first
Of three workers, A and B together build the bunds of a field in 20 days, B and C in 24 days, and C and A in 24 days. Who is the slowest worker, and how many days does that worker take alone?
StandardTry it yourself first
Three clerks A, B and C together clear a pile of 900 files in 10 days. A and B alone would take 12 days, and B and C alone 15 days. In how many days will C and A together clear the same pile?
AdvancedTry it yourself first
A and B together decorate a hall in 12 days, B and C in 12 days, and C and A in 18 days. A fourth member D can decorate the hall alone in 18 days. In how many days will all four finish if they work together?
StandardTry it yourself first
P and Q together repair a boat in 8 days, Q and R also in 8 days, while R and P take 20 days. In how many days can Q alone repair it?
AdvancedTry it yourself first
A and B together finish a 120-metre bridge-railing job in 10 days, B and C in 12 days, and C and A in 20 days. If all three work together for 4 days and then stop, what fraction of the job is left?
AdvancedTry it yourself first
A and B together paint a building in 9 days, B and C in 10 days, and C and A also in 10 days. What is the ratio of their efficiencies A : B : C?
StandardTry it yourself first
Three gardeners A, B and C weed a large 8-acre garden. In pairs, A and B take 5 days, B and C take 6 days and C and A take 10 days. How many days will the three take working together?
StandardTry it yourself first
In a pond-deepening job, A and B together take 10 days, B and C together 10 days, and C and A together 7 days. How many days will B alone take?
AdvancedTry it yourself first
Three shopkeepers decorate a fair stall: the first and second together in 12 days, the second and third in 12 days, and the third and first in 15 days. Working alone, how many days more does the slowest take than the fastest?
StandardTry it yourself first
Of three weavers, A and B together weave a carpet in 15 days, B and C in 18 days, and C and A also in 18 days. In how many days can C alone weave the carpet?
AdvancedTry it yourself first
A and B together clean a 12-storey building in 10 days, B and C in 12 days, and C and A in 20 days. Which statement(s) is/are correct?<br>I. Working alone, A is the fastest.<br>II. All three together will finish in less than 9 days.
5

E. Efficiency and the LCM total-work method

Questions 59–74

Total work in units, units per day (efficiency), work shares, statements and planning questions.

∑ Formula
Take the whole job as the LCM of the days in "units"; each worker's units a day = total units ÷ his days
total units (LCM)
units per day
BasicTry it yourself first
A completes a job in 12 days and B completes the same job in 18 days. Taking the total work as 36 units, how many units do they do per day when working together?
BasicTry it yourself first
A road-repair job is 120 units of work. Machine P does 8 units a day and machine Q does 12 units a day. In how many days will the job be finished if both run together?
StandardTry it yourself first
A, B and C do a 72-acre harvesting job alone in 12, 15 and 20 days respectively. What is the smallest number of units for the total work so that each worker's units per day is a whole number?
StandardTry it yourself first
Worker A does 8 units of work a day (1 unit = 25 tiles) and finishes the whole job alone in 15 days. Worker B does 12 units a day. In how many days can B alone do the same job?
StandardTry it yourself first
A mason lays 60 bricks an hour and his helper lays 40 bricks an hour. The wall needs 2,400 bricks in all. In how many hours will the wall be complete if both work together?
BasicTry it yourself first
A, B and C complete a job alone in 8, 10 and 12 days respectively. Taking the total work as the LCM in units, how many units does A do in 3 days?
StandardTry it yourself first
Three machines complete an order of 840 pieces alone in 14, 21 and 6 hours respectively. How many hours will the order take if all three run together?
StandardTry it yourself first
A alone completes a project in 18 days and B alone in 36 days. If they work together for 9 days, what fraction of the project is completed?
AdvancedTry it yourself first
A, B and C complete a factory order of 7,200 bottles alone in 18, 24 and 36 days respectively. If all three work together until the order is complete, what fraction of the whole order does B do?
StandardTry it yourself first
One painter can paint a hall in 12 days and his colleague in 28 days. How many days will they take to paint the hall together?
StandardTry it yourself first
Three workers of a company make 5, 8 and 12 units a day respectively. A total of 1,150 units has to be made. How many days will it take if all three work together?
BasicTry it yourself first
Machine A makes 15 units an hour (each unit is a crate of 24 bolts) and completes a whole order in 8 hours. Machine B completes the same order in 12 hours. How many units does B make in an hour?
AdvancedTry it yourself first
Three workers A, B and C do 4, 5 and 6 units of work a day respectively. The job is 125 units. For the first 2 days only A and C work, and then B joins them. How many days does the whole job take?
StandardTry it yourself first
A, B and C do a 450-page typing job alone in 15, 10 and 30 days respectively. Taking the total work as 30 units, which statements are correct?<br>I. A does 2 units a day.<br>II. B and C together do 4 units a day.<br>III. All three working together need 6 days to finish.
AdvancedTry it yourself first
A contractor has two jobs: the first of 105 units and the second of 165 units. His two workers do 6 and 9 units a day respectively. They work together, finishing the first job and then the second. How many days do both jobs take in all?
AdvancedTry it yourself first
A press has to print 240 pages in 10 days. Machine A prints 9 pages a day, and machine B has to print the rest. What is the minimum number of pages B must print per day to finish on time? (Both run together.)
6

F. Efficiency ratio and time ratio

Questions 75–92

Inverse time and efficiency ratios, "k times as efficient", "x days less/more", percentage comparisons and statements.

∑ Formula
The time ratio and the efficiency ratio are inverses of each other
solo days of two workers
BasicTry it yourself first
A, B and C take time in the ratio to complete a job. What is the ratio of their efficiencies?
BasicTry it yourself first
A is twice as efficient as B. B alone can put up a fence in 24 days. In how many days can A alone put up the same fence?
StandardTry it yourself first
A is 3 times as efficient as B. Together they whitewash a godown in 12 days. In how many days can A alone whitewash it?
StandardTry it yourself first
In finishing a job, A needs 10 days fewer than B. Working together they need 12 days. In how many days can B alone do it?
StandardTry it yourself first
A is 25% more efficient than B. B alone levels a plot in 20 days. In how many days can A alone do the same job?
StandardTry it yourself first
Three artisans A, B and C work at speeds in the proportion . The three together build a model in 6 days. How many days does A need to build it alone?
StandardTry it yourself first
A's time is three-fourths of B's time. Together they clean a pond in 12 days. In how many days can B alone clean it?
AdvancedTry it yourself first
A and B together plough a field in 12 days. If A's speed were doubled, they would plough it in 8 days. In how many days would A, at his original speed, plough it alone?
StandardTry it yourself first
A's time is of B's time, and B takes 9 days more than A. In how many days will the job be finished if they work together?
AdvancedTry it yourself first
Among three teams, A's efficiency is times B's and B's efficiency is times C's. Together they repair a dam in 12 days. In how many days can C alone do it?
StandardTry it yourself first
A is one and a half times as efficient as B, and A alone finishes the job 10 days before B alone. In how many days will they finish it together?
AdvancedTry it yourself first
The efficiencies of A and B are in the ratio . A alone finishes plastering a building 12 days earlier than B alone. How many days will they take together?
StandardTry it yourself first
A is 4 times as efficient as B. Together they tile a room in 20 days. How many more days does B alone take than A alone?
AdvancedTry it yourself first
A completes a job in 12 days and B in 20 days. Which statements are correct?<br>I. The ratio of efficiencies of A and B is .<br>II. B is 40% less efficient than A.<br>III. A is 60% more efficient than B.
AdvancedTry it yourself first
A's time is of B's time and B's time is of C's time. What is the ratio of the efficiencies A : B : C?
StandardTry it yourself first
In the same time, A can do only of the work B does. B alone completes a roof casting in 21 days. In how many days will they do it together?
AdvancedTry it yourself first
A alone takes 8 days more than the time A and B take together, and B alone takes 18 days more. In how many days will they finish the job working together?
StandardTry it yourself first
B takes 50% more time than A to harvest a field. A alone harvests it in 30 days. How many days will they take working together?
7

G. A worker leaves or joins midway

Questions 93–110

A leaves, B joins later, leaving before the end, how many days each worked, and multi-stage jobs.

∑ Formula
Each worker's work = his rate × the days he actually worked; the sum must be the whole job (1)
one-day work
BasicTry it yourself first
A alone can dig a pond in 20 days and B alone in 30 days. They work together for 6 days and then A leaves. In how many more days will B alone finish the remaining work?
BasicTry it yourself first
A alone can paint a 600 sq ft room in 15 days and B alone in 10 days. A starts the work and B joins him after 5 days. In how many days in all is the room painted?
StandardTry it yourself first
A and B can build a 250-metre garden fence alone in 12 and 18 days respectively. They start together, but A leaves 3 days before the work is finished. In how many days in all is the work completed?
StandardTry it yourself first
A alone can finish a 480-metre irrigation channel in 24 days and B alone in 16 days. They start together, but B leaves 4 days before the job is over. In how many days in all is the channel complete?
StandardTry it yourself first
A alone can colour a map of 30 districts in 15 days. A and B work together for 6 days, then A leaves and B finishes the remaining work alone in 9 more days. In how many days could B alone do the whole job?
StandardTry it yourself first
A, B and C can paint a 210-metre bridge alone in 30, 20 and 12 days respectively. All three start together but C quits after 3 days. In how many days in all is the painting complete?
StandardTry it yourself first
A alone can repair a 360-metre school boundary wall in 18 days and B alone in 36 days. A starts the work and B arrives after 6 days. In how many days in all is the repair completed?
◭ Diagram
0123456789days →ABC→
Who works for how long: A for 3 days, B for 6 days, and C keeps going until the job is done (the end is not shown).
AdvancedTry it yourself first
A, B and C can do a whole 720-sheet binding job alone in 12, 18 and 36 days respectively. All three start together. A leaves after 3 days and B leaves 3 days after that (so B works 6 days in all); C then finishes the rest alone. See the figure. In how many days in all is the job completed?
AdvancedTry it yourself first
A and B can paint a 900 sq ft wall alone in 12 and 24 days respectively. They start together, and after 2 days a third partner C, who can do the whole job alone in 8 days, joins them. In how many days in all is the painting completed?
StandardTry it yourself first
A alone can build the bunds of a 24-acre field in 15 days and B alone in 20 days. They start together, A leaves after a few days and B finishes the rest. The whole job takes 12 days in all. For how many days did A work?
AdvancedTry it yourself first
A and B can arrange the 150 shelves of a library alone in 12 and 18 days respectively. Both work together for 4 days and leave, and C finishes the rest alone in 8 days. In how many days could C alone have done the whole job?
AdvancedTry it yourself first
A alone can dig a well in 24 days. He starts alone and when one-fourth of the work is done, B joins him. The whole work is finished in 12 days in all. In how many days could B alone do the whole job?
StandardTry it yourself first
A alone can cast a roof in 18 days and B alone in 12 days. A starts alone; when one-third of the work is done, B joins him. In how many days in all is the roof cast?
◭ Diagram
01234567days →A→B→C→
A starts, B joins at the end of day 2 and C at the end of day 4; after that all three carry on until the job is done (the end is not shown).
AdvancedTry it yourself first
A, B and C can build a 72-km road alone in 24, 18 and 12 days respectively. A starts the work, B joins after 2 days and C joins 2 days after that (that is, after 4 days). See the figure. In how many days in all is the road built?
StandardTry it yourself first
A alone can put up a roadside fence in 20 days and B alone in 30 days. A works throughout and B helps for some days. The job is finished in 16 days in all. For how many days did B work?
StandardTry it yourself first
A alone can clean a 5-acre pond in 15 days and B alone in 10 days. They start together, A leaves after 3 days, and B finishes the cleaning alone. What fraction of the whole job did A do?
StandardTry it yourself first
In a press, machine P prints 30 units an hour and machine Q prints 20 units an hour. Both start an order of 1,200 units together, but P breaks down after 8 hours. How many more hours does Q need to finish the order?
AdvancedTry it yourself first
A and B can clean a 600-metre drain alone in 15 and 10 days respectively. They start together and A leaves after 2 days. B then works alone for 3 days, after which C also arrives. B and C together finish the remaining work in 2 days. In how many days could C alone do the whole job?
8

H. Alternate days and turns

Questions 111–126

One-day turns, the last part-day, who finishes, three-way rotation, 2-day turns and leftover fractions.

∑ Formula
For alternate work find the work of one cycle (2 days), count the full cycles, and divide the leftover by the next worker's rate
solo days of the two workers
BasicTry it yourself first
A can do a job alone in 20 days and B alone in 30 days. They work on alternate days, one day each, and A starts. In how many days is the job finished?
StandardTry it yourself first
P can clean a 6-floor factory in 12 days and Q in 18 days. They work on alternate days, one day each, starting with P. In how many days is the cleaning completed? (Count a part of the last day in proportion.)
AdvancedTry it yourself first
A can do a job in 16 days and B in 24 days. They work on alternate days, one day each, but B starts. In how many days is the job completed? (Count a part of the last day in proportion.)
StandardTry it yourself first
A can do a job alone in 9 days and B alone in 6 days. They work on alternate days, one day each, starting with A. On which day, and by whom, is the job completed?
AdvancedTry it yourself first
A, B and C can do a job alone in 24, 36 and 36 days respectively. They work in turns, one day each, in the order A, B, C, A, B, C, … In how many days is the job completed? (Count a part of the last day in proportion.)
StandardTry it yourself first
A can paint a 1,500 sq ft house in 15 days and B in 10 days. A works every day, but B joins him only on every third day (the third, sixth, ninth … days). In how many days is the painting completed? (Count a part of the last day in proportion.)
StandardTry it yourself first
A can do a job in 40 days and B in 60 days. They work on alternate days, one day each, starting with A. What fraction of the job remains after 10 days?
◭ Diagram
024681012days →AB
A and B take turns of 2 days each; the figure shows the first 12 days and the same pattern goes on until the job is done.
AdvancedTry it yourself first
A can do a job in 12 days and B in 18 days. A works for the first 2 days, then B for the next 2 days, then A again, and so on (see the figure). In how many days is the job completed?
AdvancedTry it yourself first
A can do a 40-page binding job alone in 15 days. A and B work on alternate days, one day each, starting with A, and the job is completed exactly at the end of day 10. In how many days could B alone do the job?
StandardTry it yourself first
Two typists P and Q are typing a document: P types 40 pages an hour and Q types 60 pages an hour. The document has 1,030 pages. They type on alternate hours, one hour each, and P starts. How many hours does the typing take in all? (Count a part of the last hour in proportion.)
AdvancedTry it yourself first
A can do a 360-metre road-marking job in 18 days and B in 12 days. They work on alternate days, one day each, starting with A, until the job is complete (the last worker stops the moment the job is done). What fraction of the whole job does B do?
AdvancedTry it yourself first
A can do a job in 10 days and B in 20 days. They work on alternate days, one day each. By how many days sooner is the job finished if the faster worker A starts, compared with B starting? (Count a part of a day in proportion.)
StandardTry it yourself first
A can repair a 1,200 sq ft roof in 12 days and B in 8 days. A works every day, but B joins him only on even-numbered days (the second, fourth, sixth … days). In how many days is the repair completed? (Count a part of the last day in proportion.)
StandardTry it yourself first
B alone takes 10 days to paint a mural. A works on the first day, B on the second, A again on the third, and so on in turns, and the mural is complete at the close of day 11. How many days would A alone take to paint it?
AdvancedTry it yourself first
A can do a 150-bed ward-painting job in 12 days and B in 18 days. They work in this pattern: A for one day, then B for two days, then A for one day, then B for two days, and so on. In how many days is the job completed? (Count a part of the last day in proportion.)
StandardTry it yourself first
A can do a job in 12 days and B in 24 days. They work on alternate days, one day each, starting with A. Which statements are correct?<br>I. The job is finished in exactly 16 days.<br>II. The last day's work is done by B.<br>III. A does one-third of the whole job.
9

I. Fraction of work done and left

Questions 127–142

Part done in some days, time for the rest, A then B finishing, and the whole-job time from a fraction.

∑ Formula
Divide the days worked by the days for the whole job — that is the part done; the rest is 1 − part done
days actually worked
BasicTry it yourself first
A tailor stitches all the uniforms alone in 24 days. What fraction of the uniforms will he finish in 9 days?
BasicTry it yourself first
A and B together finish polishing a floor in 15 days. After 4 days of joint work, what fraction of the polishing is left?
StandardTry it yourself first
A builds of a 60-metre fence in 12 days. How many more days will he need to build the rest?
StandardTry it yourself first
A alone can line a 30-foot-deep well in 20 days. He works for 5 days and leaves, and B alone finishes the rest in 9 days. In how many days could B alone have lined the whole well?
AdvancedTry it yourself first
A alone can do a whole 600-metre fencing job in 15 days and B alone in 30 days. A works for the first 5 days, then B for the next 6 days, and C alone finishes the rest in 14 days. In how many days could C alone do the whole job?
StandardTry it yourself first
A alone can decorate a map of 18 states in 12 days and B alone in 20 days. They work together for 5 days. How many more days do they need, working together, to finish the decoration?
StandardTry it yourself first
A and B together build of a bridge railing in 6 days. A alone builds the whole railing in 20 days. In how many days can B alone build the whole railing?
StandardTry it yourself first
A does of a job in 9 days and B does of the same job in 10 days. In how many days will they do the whole job together?
AdvancedTry it yourself first
A can do of a job in 4 days and B can do of it in 5 days. If they work together for 6 days, what fraction of the job is left?
StandardTry it yourself first
A alone can finish a 420-metre roadside drain in 16 days and B alone in 24 days. A works for 6 days and steps out, then B works for 9 days. What fraction of the work is still left?
AdvancedTry it yourself first
A is twice as efficient as B. A alone first does half of the job, and then B finishes the other half in 12 days. In how many days in all was the whole job done?
StandardTry it yourself first
A craftsman has completed of an order in 10 days. At the same pace, how many more days will he need to finish the order?
AdvancedTry it yourself first
A started cleaning a hall. After working for 9 days, of the cleaning was still left. In how many days could A alone have cleaned the whole hall?
AdvancedTry it yourself first
In polishing a floor, A does in 4 days as much work as B does in 6 days. Together they polish the whole 1,440 sq ft floor in 12 days. In how many days can A alone polish the whole floor?
AdvancedTry it yourself first
A does of a 270-page copying job in 18 days and B does of the same job in 8 days. Which statements are correct?<br>I. A alone will do the whole job in 24 days.<br>II. B alone will do the whole job in 12 days.<br>III. Together they will do the whole job in 9 days.
StandardTry it yourself first
A can paint a wall in 12 days and B in 6 days. A worked for 5 days and B for 3 days. What fraction of the wall is still unpainted?
10

J. Finishing earlier or later than scheduled

Questions 143–154

Plan versus actual time, finishing sooner with help, delay from absence or a fault, and meeting a deadline.

RememberIn schedule questions find the planned time and the actual time separately, then take the difference; read "late" or "early" carefully. In every case the whole job is 1.
StandardTry it yourself first
A alone can complete a patch-work on a 54-km road in 30 days. He starts alone and B joins him after 10 days, due to which the work finishes 6 days earlier than A alone would take. In how many days could B alone do the whole job?
StandardTry it yourself first
A and B together would have repaired a 300-metre dam in 12 days. But after 4 days A fell ill and B finished the rest alone in 16 more days. By how many days was the job late compared with the plan?
StandardTry it yourself first
A and B can build an irrigation system for a 60-acre garden alone in 24 and 40 days respectively. If a third craftsman C, who can build it alone in 60 days, also joins from the first day, by how many days earlier is the work done than with A and B only?
StandardTry it yourself first
A alone can build a stage for an event in 24 days, but the stage must be ready in 15 days. B is brought in from the first day to work alongside A, and the work is finished exactly in 15 days. In how many days could B alone build the stage?
BasicTry it yourself first
A and B are equally skilled and each alone finishes a 90 sq m tiling job in 12 days, so the plan for working together is 6 days. Throughout the job B's pace was only half the normal. By how many days is the job late compared with the plan?
AdvancedTry it yourself first
A contractor's worker A can lay the flooring of a 14-room school building alone in 36 days. A starts alone, B joins after 9 days, and the work is done 12 days earlier than A alone would take. In how many days could B alone lay the whole flooring?
StandardTry it yourself first
Machine A completes an order in a certain number of days at its normal speed. Because of a fault it ran at of its normal capacity, and the order took 6 days more than normal. How many days would it take at normal speed?
BasicTry it yourself first
A stadium staircase job has to be finished in 45 days. Worker A alone can do it in 60 days and B alone in 90 days. If they work together, how many days before the deadline is the job finished?
AdvancedTry it yourself first
A and B can clean a 40-foot-deep well alone in 12 and 24 days respectively. If a third worker C joins from the first day, the cleaning is finished 2 days sooner than with A and B only. In how many days can C alone clean the well?
AdvancedTry it yourself first
A can do a job alone in 20 days and B in 30 days. Which statements are correct?<br>I. With B's help the job is done 8 days earlier than A alone.<br>II. With A's help the job is done 18 days earlier than B alone.<br>III. Working together they finish the job in 10 days.
StandardTry it yourself first
A alone removes the silt from a pond in 25 days. With B's help the same job takes 40% less time than A alone. In how many days can B alone do it?
BasicTry it yourself first
Three identical craftsmen together build a canopy in 4 days. If one of them is absent from the very first day, by how many days is the canopy late?
11

K. Percentage change in efficiency

Questions 155–166

New time when efficiency changes, percent change of time versus efficiency, a mid-job change and shares of work.

∑ Formula
If efficiency rises by the time becomes times; if it falls, the time becomes times
percentage change in efficiency
BasicTry it yourself first
A craftsman does a 24-chair job in 20 days. After training his efficiency rises by 25%. In how many days will he now do the same job?
BasicTry it yourself first
Because of tiredness a labourer's efficiency falls by 25%. At normal efficiency he digs a drain in 24 days. How many days will he take at the reduced efficiency?
StandardTry it yourself first
A machine took 25% more time than normal for an order. By what percent did its efficiency fall?
StandardTry it yourself first
A craftsman's efficiency rises by 50%. By what percent will his time for a job fall?
StandardTry it yourself first
A is 25% more efficient than B. B alone makes a library's cupboards in 36 days. How many days will they take working together?
StandardTry it yourself first
B's efficiency is 40% less than A's. A alone completes a road survey in 24 days. In how many days will the survey be done if they work together?
AdvancedTry it yourself first
A worker does a job in 20 days at normal efficiency. After half the job is done his efficiency drops by 20%. In how many days in all is the job completed?
AdvancedTry it yourself first
A and B do a 540 sq ft tiling job alone in 12 and 24 days respectively. After training A's efficiency rises by 25% and B's by 50%. By what percent does their joint time fall compared with before?
StandardTry it yourself first
A's efficiency is 40% more than B's. B alone takes 14 days more than A alone for a job. In how many days can A alone do the job?
AdvancedTry it yourself first
A worker can do a job in 30 days at normal speed. After working 10 days he changes his tools and his efficiency rises by 50%. In how many days in all is the job done?
AdvancedTry it yourself first
A is 25% more efficient than B. They complete a job together, both working from start to finish. What percentage of the job did B do?
AdvancedTry it yourself first
A is 20% more efficient than B and does the same job 5 days faster than B. In how many days can B alone do the job?
12

L. Hours, minutes, daily hours and counting items

Questions 167–182

Hour-minute conversions, changing daily hours, a part of the work, items per minute and shift work.

RememberKeep one unit of time throughout (hours or minutes). When daily hours appear, first write the whole job in worker-hours and then divide in the new situation. If items (pages, bricks) are given, rate = items ÷ time.
BasicTry it yourself first
P takes 90 minutes to type a report and Q takes only 60 minutes. If both type it together (each on a different part), in how many minutes is the report finished?
BasicTry it yourself first
Ravi packs 18 boxes in 6 minutes and Sana packs 30 boxes in 6 minutes. How many boxes will they pack in 12 minutes working together?
StandardTry it yourself first
A craftsman working 8 hours a day finishes a furniture order of 36 chairs in 12 days. If he works only 6 hours a day, how many days will the same order take?
StandardTry it yourself first
A, working 8 hours a day, completes a job in 15 days. B, working 6 hours a day, completes exactly the same job (identical in size) in 20 days. If both work 8 hours a day together, in how many days is the job done?
StandardTry it yourself first
A and B together complete casting a roof in 12 days. At the same pace, in how many days will they finish of the casting?
StandardTry it yourself first
P can service a 12-station machine in 1 hour 15 minutes and Q in 50 minutes. How many minutes will they take servicing it together?
StandardTry it yourself first
A can paint a 2,000 sq ft godown in 10 days and B in 15 days (each counting full working days). A works the full day every day, but B works only half a day each day, doing half of his full-day work. In how many days is the painting finished?
StandardTry it yourself first
A worker working 8 hours a day completes the construction of a 60-cow cowshed in 20 days. The contractor wants it done in 16 days. How many hours a day must the worker work?
AdvancedTry it yourself first
Machine A makes 240 toys in 5 hours and machine B makes 300 toys in 4 hours. How many hours do they need to make 1,230 toys running together?
AdvancedTry it yourself first
Two workers A and B take 25 days in all if A alone does the first half of a job and B alone does the second half. Working together on the whole job they take 12 days. In how many days would the slower of the two do the whole job alone?
StandardTry it yourself first
X can do a job in 6 hours and Y in 4 hours. How long will they take to finish the job working together?
AdvancedTry it yourself first
In a press, machine A prints 30 pages a minute and machine B prints 45 pages a minute. An order has 9,000 pages. A runs alone for 40 minutes and then B is switched on too. In how many minutes in all is the whole order printed?
AdvancedTry it yourself first
A takes 7 hours less than B for a repair job. Together they finish it in 12 hours. In how many hours can B alone do it?
AdvancedTry it yourself first
A finishes a stitching order by putting in 6 hours every day for 20 days, while B finishes the same order by putting in 9 hours every day for 8 days. If the two work together, each for 12 hours a day, in how many days is the order ready?
StandardTry it yourself first
Machine A needs to run 20 hours in all to complete a 900 kg order and machine B needs 40 hours in all. Every day A runs 3 hours in the morning and B runs 4 hours in the evening. In how many days is the order completed?
StandardTry it yourself first
Clerk A fills 60 forms in 40 minutes and clerk B fills 90 forms in 45 minutes. How many forms will they fill in 1 hour working together?
13

M. Reverse, statement and comparison questions

Questions 183–198

Percent per day, efficiency ratios, who is faster, which statement is correct, possible values and stories with hidden data.

RememberIn a reverse question the result (days or rate) is given and an input is asked. In statement questions check each statement separately and never accept one unsolved. In comparisons find both times first.
BasicTry it yourself first
A completes 7% of the whole job each day and B completes 3% each day. How many days do they need to finish the job together?
StandardTry it yourself first
A and B together weed a field in 18 days. A alone does it in 27 days. What is the ratio of the efficiencies of A and B?
StandardTry it yourself first
Three pairs do the same job separately. Pair 1: 10 and 15 days alone. Pair 2: 9 and 18 days alone. Pair 3: 8 and 24 days alone. Each pair works together. Which pair finishes first?
StandardTry it yourself first
A alone prints a 96-page booklet in 12 days. B alone takes 30 days and C alone takes 15 days. Who finishes sooner, A alone or B and C together, and by how many days?
AdvancedTry it yourself first
A is twice as efficient as B and B is three times as efficient as C. Which statements are correct?<br>I. A is 6 times as efficient as C.<br>II. If C alone does a 180-page typing job in 36 days, A alone does it in 6 days.<br>III. A and B together are 8 times as efficient as C.
AdvancedTry it yourself first
Three craftsmen: A does of a job in 3 days, B does of the job in 4 days, and C does of the job in 5 days. Who is the fastest and who is the slowest?
StandardTry it yourself first
A does a 180 sq m tiling job in 15 days and B in 10 days. By what percent is A's efficiency less than B's?
StandardTry it yourself first
A finishes 40% of a project in 8 days, whereas B takes 10 days to finish 25% of it. How long will the two need for the whole project if they work together?
AdvancedTry it yourself first
A is 20% more efficient than B, and B does a job in 30 days. C's efficiency is 25% less than A's. In how many days will C alone do the same job?
AdvancedTry it yourself first
A and B together do a job in 10 days. Working alone, A takes strictly more days than B. Which one of these four values can be the number of days A takes alone?
StandardTry it yourself first
A does a job alone in 18 days and B alone in 30 days. They complete the job together. What is the ratio of the work done by A to the work done by B?
StandardTry it yourself first
A alone can clean a roof in 10 days. A and B together clean it in 6 days, while A and C together take days. Working alone, by how many days does B finish earlier than C?
StandardTry it yourself first
A alone does a job in 30 days. If B, who can do the same job alone in 15 days, joins him, what fraction of A's solo time is saved?
BasicTry it yourself first
A does 9% of a job a day and B does 4% a day. After they work together for 7 days, what percent of the job is left?
StandardTry it yourself first
Three cleaners can clean a station alone in 17, 23 and 29 days respectively. If the three work as one team, what is the time needed, rounded to the nearest whole day?
AdvancedTry it yourself first
Sunita takes as long to paint a wall as Anil takes to paint of it (so Sunita's time is of Anil's). Together they take 12 days. In how many days would Anil alone paint the whole wall?
14

N. Questions based on diagrams and graphs

Questions 199–210

Solve by reading work bars, alternate-day charts, units-per-day bars and cumulative-work graphs.

RememberEach bar in a figure shows the days on which a worker works; the length of a bar is his days of work. Read each worker's days from the figure first, then add "rate × days" and equate to 1.
◭ Diagram
012345678910days →AB
A works the first 6 days; B works all 10 days, and the job ends then.
BasicTry it yourself first
The figure shows the work of A and B. A alone can do the whole job in 18 days. According to the figure the whole job is finished in 10 days. In how many days could B alone have done the whole job?
◭ Diagram
012345678910days →AB
A works the first 7 days; B arrives after day 3 and stays until the job ends (day 10).
StandardTry it yourself first
The figure shows the days on which A and B work. B alone can do the whole job in 14 days and, as the figure shows, the job ends on day 10. In how many days could A alone do the whole job?
◭ Diagram
01/41/23/41012345678days →1/4done
The graph shows how much of the job is done as days pass. One-fourth is done in the first 3 days; the steeper slope shows that a second worker has joined.
StandardTry it yourself first
In the graph A starts alone and B joins after the third day. According to the graph the job is complete in 7.5 days. In how many days could B alone do the whole job?
◭ Diagram
012345678days →AB
A works on the odd days and B on the even days; the plan for 8 days.
StandardTry it yourself first
The figure shows A and B working in turns. A alone can do the whole job in 16 days and B alone in 24 days. What fraction of the job is done at the end of the 8 days shown?
◭ Diagram
02468101214days →ABC
The three work one after another: A for the first 5 days, B for the next 6 and C for the last 3.
AdvancedTry it yourself first
As the figure shows, A, B and C work one after another on a 480-metre pipeline. A alone can do the whole job in 12 days and B alone in 18 days. In how many days could C alone do the whole job?
◭ Diagram
012345678units per day →A6B4C2
The length of each bar is the worker's units per day: A 6, B 4 and C 2 units a day.
StandardTry it yourself first
The figure shows the daily efficiency (units a day) of three workers. A job is 144 units. If C is absent and only A and B work together, in how many days is the job finished?
◭ Diagram
024681012days →ABC
A works from the start, B joins on day 4 and C on day 8; all stay until day 12.
AdvancedTry it yourself first
As the figure shows, three workers join on different days and the job ends at the end of day 12. A alone can do the whole job in 20 days and B alone in 30 days. In how many days could C alone do the whole job?
◭ Diagram
0123456789days →AB
Both start together; A leaves after day 5 and B finishes the job on day 9.
StandardTry it yourself first
The figure shows the work of A and B. A alone can do the whole job in 10 days. In how many days can B alone do the whole job?
◭ Diagram
01/41/23/4102468101214days →1/3done
The flat part of the graph shows that work stopped for a few days.
AdvancedTry it yourself first
The graph shows the cumulative work of a team. The pace of work is the same before and after the stoppage. For how many days was work stopped, and in how many days would the whole job have been done without any stoppage?
◭ Diagram
012345678910days →A+BC
A and B work together for the first 6 days and then C finishes the rest in the next 4 days.
StandardTry it yourself first
As the figure shows, A and B together worked for 6 days and finished of the job, and C alone finished the rest in 4 days. In how many days could C alone have done the whole job?
◭ Diagram
012345678hours of one day →AmorningBevening
Of the 8 hours of each day, A works the first 4 hours and B the last 4 hours.
AdvancedTry it yourself first
The figure shows the split of one 8-hour working day. A, working 8 hours a day, does the whole 400 sq m flooring job in 12 days, and B, working 8 hours a day, in 8 days. If, as in the figure, each works 4 hours every day, in how many days is the job done?
◭ Diagram
01/41/23/41012345678910days →1/2done
In the graph both workers are present at first (steep slope); after day 4 one of them leaves (gentler slope).
AdvancedTry it yourself first
In the graph A and B start working together. After the fourth day A leaves and B finishes the job alone on day 10. In how many days could A alone do the whole job?
Free Study Planner